Jump to content

GreenStreet: Mixed-Use Development At 1201 Fannin St.


MontroseNeighborhoodCafe

Recommended Posts

the city is doing everything it can to force that owner to sell and there apparently have been several recent offers to purchase... we've heard that before but this time there is real impetus with all the renovations slated for the main street corridor over the next year. clearly that thing prints money, though.

 

btw i heard a well known and very familiar developer has won out on the sakowitz building...

Great so can you tell us who? Geez

Link to comment
Share on other sites

the city is doing everything it can to force that owner to sell and there apparently have been several recent offers to purchase... we've heard that before but this time there is real impetus with all the renovations slated for the main street corridor over the next year. clearly that thing prints money, though.

btw i heard a well known and very familiar developer has won out on the sakowitz building...

My guess is midway. That have a vested interest in that immediate area. Or Lovett. They have been doing tons of cool new stuff

  • Like 1
Link to comment
Share on other sites

So, they went from smashing what was there before to 3 floors built in less than 9 months.  There's not a good analogous project in downtown that I can think of offhand, but that seems relatively fast.

 

Skyhouse was built in like 4 hours.

  • Like 3
Link to comment
Share on other sites

Probably a stupid question, but is the city just adding some trees and lights to enhance the pedestrian experience along Dallas Street? If so, why is this taking so long?

I attended a downtown business/resident meeting on this before construction ever started. There was a LOT of "stuff" that they wanted to do with utilities. I don't recall what but I remember thinking "wow, that is a lot of work....."

Page 7&8. http://downtownhouston.org/site_media/uploads/attachments/2015-03-06/150304_SDSI_Streetscape_Plan.pdf

I also seem to recall that construction was supposed to end in early spring 2016 (Feb/March) but I could be wrong.....

Edited by UtterlyUrban
  • Like 3
Link to comment
Share on other sites

I'd imagine that the original schedule has been blown.  We've been a lot wetter than usual, and I wouldn't be surprised if they found various unexpected weird stuff that wasn't mapped - though one would hope that would be built into the schedule after the way such things busted earlier major street time lines.

Link to comment
Share on other sites

What accident idea? I don't know what you're talkin' about....

article-2182335-0CD82838000005DC-10_306x

 

God forbid something should happen. That's all I'm saying...

 

 

I'm probably alone on all this, but I enjoy some of the grittier aspects of downtown in certain pockets. Time Square used to be an interesting place to visit until they turned into Disney World. Ultimately I agree they will get priced out of the market, but I don't relish the idea of forcing these business out just so white people can feel safer. 

  • Like 1
Link to comment
Share on other sites

God forbid something should happen. That's all I'm saying...

 

 

I'm probably alone on all this, but I enjoy some of the grittier aspects of downtown in certain pockets. Time Square used to be an interesting place to visit until they turned into Disney World. Ultimately I agree they will get priced out of the market, but I don't relish the idea of forcing these business out just so white people can feel safer. 

I couldn't agree more. The 99 cent store off Main is a cool little store to find quick things. I mean you're in the city, and people want suburbia. I don't get that. I went to a concert recently at Toyota Center and it wasn't difficult to see the difference in those who live or grew up in the city and those who didn't. Some of those people looked terrified. 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...