Jump to content

Lower Westheimer Road Construction


Recommended Posts

  • 3 months later...
  • 3 months later...

Update

I heard David Robinson speak at last nights Neartown/Montrose monthly meeting. Many of his remarks were Buget centered and the hardship police- firemen pay parity was putting on COHbuget. 

When asked about lower Westheimer renovation funding......he seemed to say that the renovations from Main to Montrose and from Montrose to Shepherd were two projects where one was funded one was not. Now those are looked at as one project that is partially funded.

Edited by trymahjong
  • Like 1
Link to comment
Share on other sites

  • 4 weeks later...

The City of Houston submitted the Lower Westheimer S. Main to Shepherd portion to the Houston Galveston Area Council to try to obtain federal funding. It was the only road diet project submitted that I saw.

 

They released draft rankings (PDF warning) in January and it was ranked 20th out of 63. Unfortunately, HGAC only has funding for the top 10 projects.

 

The cost estimate was $33,432,000 and HGAC calculated the benefits to be $96 million. They requested funding for the 2023 year.

 

It did not fare particularly well in the "Planning Factors Score" which I'm not sure how exactly that is calculated. 

 

I believe they are letting everyone revise their application once, so we'll see a new rankings in the next month - 3 months I believe. 

 

 

  • Sad 1
Link to comment
Share on other sites

6 hours ago, wilcal said:

The City of Houston submitted the Lower Westheimer S. Main to Shepherd portion to the Houston Galveston Area Council to try to obtain federal funding. It was the only road diet project submitted that I saw.

 

They released draft rankings (PDF warning) in January and it was ranked 20th out of 63. Unfortunately, HGAC only has funding for the top 10 projects.

 

The cost estimate was $33,432,000 and HGAC calculated the benefits to be $96 million. They requested funding for the 2023 year.

 

It did not fare particularly well in the "Planning Factors Score" which I'm not sure how exactly that is calculated. 

 

I believe they are letting everyone revise their application once, so we'll see a new rankings in the next month - 3 months I believe. 

 

 

Well this sucks! 2023!? WTH!?

Link to comment
Share on other sites

6 hours ago, wilcal said:

The City of Houston submitted the Lower Westheimer S. Main to Shepherd portion to the Houston Galveston Area Council to try to obtain federal funding. It was the only road diet project submitted that I saw.

 

They released draft rankings (PDF warning) in January and it was ranked 20th out of 63. Unfortunately, HGAC only has funding for the top 10 projects.

 

The cost estimate was $33,432,000 and HGAC calculated the benefits to be $96 million. They requested funding for the 2023 year.

 

It did not fare particularly well in the "Planning Factors Score" which I'm not sure how exactly that is calculated. 

 

I believe they are letting everyone revise their application once, so we'll see a new rankings in the next month - 3 months I believe. 

 

 

 

What sucks is that nearly all the funding is being diverted to the suburbs. With the exception of the Shepard/Durham complete streets, most of the money is being put to projects beyond 610. Oh yeah, and I guess a few bikeways and bus stop improvements. Yaaaaaa??????

 

EDIT: I get it. There is a significant population in this city that lives in the suburbs, and these areas need to be served as well, but the trend is people moving into the inner city. Plus the roads in town are in way worse shape than anything beyond 610.

Edited by Luminare
Link to comment
Share on other sites

1 minute ago, Luminare said:

 

What sucks is that nearly all the funding is being diverted to the suburbs. With the exception of the Shepard/Durham complete streets, most of the money is being put to projects beyond 610. Oh yeah, and I guess a few bikeways and bus stop improvements. Yaaaaaa??????

That's def a bright spot but man all of that money going to the burbs is ridiculous. 

Link to comment
Share on other sites

16 hours ago, Luminare said:

EDIT: I get it. There is a significant population in this city that lives in the suburbs, and these areas need to be served as well, but the trend is people moving into the inner city. Plus the roads in town are in way worse shape than anything beyond 610.

 

 

Houston-Galveston Area Council serves a 13 county area in SE TX. Inside 610 really doesn't have that much population compared to the rest of it. Isn't the pop like 200k? It's pretty low. 

 

H-GAC.png

Link to comment
Share on other sites

15 hours ago, BeerNut said:

So the number 1 major funding is for BRT/HOV on I10 downtown to 610? Does this mean this will be funded without funds from the bond referendum? 

 

Basically, yes. BUT, I don't think it's actually a part of the scheduled bond referendum projects because they were counting on this.

 

H-GAC said that they will have funds to fun only 1 of the 3 "major" projects. 

 

Also, from what I heard, this two-way HOV/BRT will be elevated. They are selling it as a flood-proof connection from dowtown Houston center of government to the Transtar/County Operations center thing at I-10/610. 

  • Like 4
Link to comment
Share on other sites

6 minutes ago, wilcal said:

 

Houston-Galveston Area Council serves a 13 county area in SE TX. Inside 610 really doesn't have that much population compared to the rest of it. Isn't the pop like 200k? It's pretty low. 

 

H-GAC.png

 

More like 500,000, but your point stands.  It is only around 7% of the population of the entire area and not adding anywhere near the numbers as the areas outside the Loop (despite what it may seem like to those of us who live inside the Loop and focus on urban growth and development.)

  • Like 1
Link to comment
Share on other sites

22 minutes ago, wilcal said:

 

Houston-Galveston Area Council serves a 13 county area in SE TX. Inside 610 really doesn't have that much population compared to the rest of it. Isn't the pop like 200k? It's pretty low. 

 

H-GAC.png

 What percentage of employment and tax base is encompassed inside the Loop?

  • Like 1
Link to comment
Share on other sites

9 minutes ago, BeerNut said:

 What percentage of employment and tax base is encompassed inside the Loop?

 

I'm not sure. Inside 610 is 97ish square miles and the H-GAC represents 12,444 sq miles (.779%). You can see in the linked PDF that half of the score that they calculate comes from a cost to benefit ratio, and that benefit is calculated based on usage. It's clearly not aimed purely at relieving traffic as the lower Westheimer scored pretty well while being classified a road diet. 

 

Basically, what I'm getting at is that they are attempting to normalize for usefulness without factoring in what part of the area it is in. 

 

Also, I did find a population number for inside 610. In 2010 census it was 443,949. The highest was the 1960 census at 493,377. I bet we eclipse that in 2020. 

  • Thanks 1
Link to comment
Share on other sites

11 hours ago, Triton said:

Will those roads even still be driveable by 2023?? Those outer lanes between Montrose and Bagby are getting so bad, Evel Knievel wouldn't even dare it...


These are the same lanes that the 82 Wesheimer buses are forced to negotiate. The ride between Bagby and Montrose is deafening and bone-rattling. Every bolt and rivet in those poor buses shriek in protest at this abuse. I can't help but wonder what effect this has on the useful life of a bus.
Often, what we don't pay for in one way forces us to pay in another.

  • Like 3
  • Sad 1
Link to comment
Share on other sites

7 hours ago, dbigtex56 said:


The ride between Bagby and Montrose is deafening and bone-rattling. Every bolt and rivet in those poor buses shriek in protest at this abuse. I can't help but wonder what effect this has on the useful life of a bus.

 

Bus manufacturers learned to build stronger buses after the Grumman 870 A-frame crack issue in the early 80s that impacted transit fleets nationwide, including Houston. Potholes in places like NYC were causing the frames to crack and the buses to sag in the middle and eventually stop. I wouldn't be surprised if Westheimer was the cause of some of those frame cracks way back then!

  • Like 1
Link to comment
Share on other sites

  • 1 month later...

I remember a poorly maintained abandoned train track crossing on Westheimer about in front of what is present day Katz restaurant. It was horrible, and probably broke many a shock absorber. Why the city didn't just pull up the old tracks embedded in the pavement instead of just continually paving over it,  I'll never know? It's been gone for years now, but I remember it still being there as a young driver as late as 1970. However I'm sure the GMC Dreamliners handled it much better than the Grumman's would have. Those Dreamliners were solid!

  • Like 1
Link to comment
Share on other sites

On 1/22/2019 at 5:28 PM, trymahjong said:

I had heard at Cohen’s townhall that lower Westheimer from Bagby to Montrose is paid for.!!

But from Montrose to Shepherd is still seeking funding.

AnotherEllen Cohen meeting this time a CIP held in latter March—

 

its. “For Sure” that lower Westheimer renovation project that was 100% paid for and destined to begin in late 2018-2019 is now labeled

” a partially funded project from Bagby to Shepherd” with a not specific start date.

Fully funded pocket park at 424 Westheimer start date set back. Those street repaired from Main to Bagby where new sidewalks were installed- not an official COH sidewalk improvement project.

afew of the answers from Cohens panel; were confusing.

  • Confused 1
Link to comment
Share on other sites

3 hours ago, trymahjong said:

AnotherEllen Cohen meeting this time a CIP held in latter March—

 

its. “For Sure” that lower Westheimer renovation project that was 100% paid for and destined to begin in late 2018-2019 is now labeled

” a partially funded project from Bagby to Shepherd” with a not specific start date.

Fully funded pocket park at 424 Westheimer start date set back. Those street repaired from Main to Bagby where new sidewalks were installed- not an official COH sidewalk improvement project.

afew of the answers from Cohens panel; were confusing.

I’ll take whatever reconstruction we can get at this point. But no specific start date is annoying. This city will build sidewalks and find funding in the blink of an eye for a big event but hell if it’s the general citizens we have to wait forever. And if the pocket park if funded then start on the damn thing smh why is the date being set back, makes no sense 

Edited by j_cuevas713
Link to comment
Share on other sites

38 minutes ago, trymahjong said:

No real reason I should speculate..

No real reason you shouldn't, either. You've been a reliable source of information about projects in the Montrose area; those of us who haven't attended the various planning meetings and town halls appreciate the summaries you provide.
Saying money matters at COH are probably a headache is putting it mildly. The financial effects of TS Harvey will be felt for years, and the additional strain of complying with Prop B will surely delay and scale back many plans that are on the books.
IMO, the condition of Lower Westheimer has reached the point where renovation is mandatory, not optional. I'm in favor of starting where it's most urgently needed -  the stretch between Elgin and Montrose Blvd. We can't afford not to fix it.

  • Like 3
  • Thanks 1
Link to comment
Share on other sites

57 minutes ago, dbigtex56 said:

No real reason you shouldn't, either. You've been a reliable source of information about projects in the Montrose area; those of us who haven't attended the various planning meetings and town halls appreciate the summaries you provide.
Saying money matters at COH are probably a headache is putting it mildly. The financial effects of TS Harvey will be felt for years, and the additional strain of complying with Prop B will surely delay and scale back many plans that are on the books.
IMO, the condition of Lower Westheimer has reached the point where renovation is mandatory, not optional. I'm in favor of starting where it's most urgently needed -  the stretch between Elgin and Montrose Blvd. We can't afford not to fix it.

I couldn't agree more. At least the stretch between Elgin and Montrose would be good for the moment. 

Link to comment
Share on other sites

2 hours ago, bobruss said:

I would put Richmond from 59 to Shepherd right up there with Westheimer.

Alabama from San Jacinto to 288 is also a bad stretch.

Hopefully with the METRO bond vote coming up Richmond will get redone when they put in BRT.

Link to comment
Share on other sites

On 4/6/2019 at 11:47 AM, plumber2 said:

I remember a poorly maintained abandoned train track crossing on Westheimer about in front of what is present day Katz restaurant. It was horrible, and probably broke many a shock absorber. Why the city didn't just pull up the old tracks embedded in the pavement instead of just continually paving over it,  I'll never know? It's been gone for years now, but I remember it still being there as a young driver as late as 1970. However I'm sure the GMC Dreamliners handled it much better than the Grumman's would have. Those Dreamliners were solid!

Probably was the old GH&SA line that had the bridge over Buffalo Bayou where the pedestrian bridge is now.

  • Like 2
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...