Midtown Streetscape Improvements


Purdueenginerd

Recommended Posts

1 hour ago, Triton said:

 

I was just thinking about this the other day. How is Bagby considered a complete street in midtown when it does not include a bike lane?

Or even painted crosswalks at the intersections without lights.

 

There is so much pedestrian activity here that there should be HAWK signals as well. 

  • Like 1
Link to comment
Share on other sites

25 minutes ago, editor said:

 

While I agree that wider sidewalks are better, it's possible that there is a reason for the focus on landscaping instead of walkability.  There are studies that show landscaped sidewalks actually slow down the average speed of traffic on a street ("street calming" they call it).  

 

If this project is headed up by a transportation agency instead of a community improvement group, then that could be the reason for the focus on landscaping instead of pedestrian-level amenities.

 

Or I could be smoking the crack waffles again.  That's also possible.

 

Probably right. Actually if the landscape is more like the swales that are at Bagby St or like the garden areas at Midtown Park then that would be excellent. We need more stuff like that. Its both pleasing aesthetically and functionally. Win-Win in my book, yet Midtown has been slow to roll this out throughout the district.

  • Like 2
Link to comment
Share on other sites

On 6/17/2019 at 2:50 PM, wilcal said:

Or even painted crosswalks at the intersections without lights.

 

There is so much pedestrian activity here that there should be HAWK signals as well. 

 

Nowhere else to really post this, but the city has added a four-way stop to Bagby @ Pierce street.

 

This is a big improvement as there were many pedestrians trying to cross who were not heeded the right of way and some cars traveling down Pierce St were having difficulties getting across. 

Link to comment
Share on other sites

I wonder if any thought was ever given to converting Caroline to a 2-way street. I see zero reason not to, and in fact narrowing it to 3 through lanes makes it pretty easy. You do have the additional 5' for the insulting "bike lane" to deal with now though. 

  • Like 2
Link to comment
Share on other sites

  • 3 weeks later...
1 hour ago, dbigtex56 said:

"nearing completion" and "almost complete" can take a long, long time.

 

These meeting minutes are from May. Two months later, they have finished the sanitary sewer on McIlhenny and are currently working on Hadley. I'm not 100% sure of the status of the waterline, but I think the portion south of McGowen is complete.

Link to comment
Share on other sites

  • 2 months later...
  • 6 months later...
On 4/7/2020 at 8:40 AM, dbigtex56 said:

Caroline St has been reduced to two lanes from McGowen St to the Pierce Elevated (?), with concrete barriers in place.

 

Austin Street is currently being re-striped to add the bi-directional bikeway along the eastern curb, as well as parking on both sides of the now two lane roadway. 

  • Like 7
Link to comment
Share on other sites

  • 2 months later...
  • 6 months later...

It looks like the contractors got a kick in the rear because the pace of street pouring has really increased. I would guess there's a month or two left for the street works, then the focus will shift to sidewalks and later landscaping.

I also noticed this while walking in the area:
2406 Caroline has been completely scraped clean. Has anyone heard of something being developed here? It's a weird spot for townhomes, but a low-rise condo tower might make sense. Paired with the lot next door, this would have amazing potential.

Google streetview of the site:https://www.google.com/maps/@29.7442048,-95.3712092,3a,84.2y,305.44h,92.35t/data=!3m7!1e1!3m5!1scGs37zyWFtyTK0EkR4vExQ!2e0!6s%2F%2Fgeo3.ggpht.com%2Fcbk%3Fpanoid%3DcGs37zyWFtyTK0EkR4vExQ%26output%3Dthumbnail%26cb_client%3Dmaps_sv.tactile.gps%26thumb%3D2%26w%3D203%26h%3D100%26yaw%3D20.732653%26pitch%3D0%26thumbfov%3D100!7i16384!8i8192

Link to comment
Share on other sites

  • 4 months later...
On 1/21/2021 at 10:50 AM, phillip_white said:

It looks like the contractors got a kick in the rear because the pace of street pouring has really increased.

Was nice while it lasted. Another kick would be welcome, as they seem to have stalled in the Webster/Hadley block for weeks now.

  • Like 2
Link to comment
Share on other sites

1 hour ago, dbigtex56 said:

Was nice while it lasted. Another kick would be welcome, as they seem to have stalled in the Webster/Hadley block for weeks now.

I was actually just thinking about how all of the work seemed to slow down within a week of my prediction. 6 months later and I would still guess one to two months left on the street work! However, the final product is starting to show through and it's going to be quite the upgrade.

  • Like 2
Link to comment
Share on other sites

  • 3 months later...

Safer Commuting and Stunning Surroundings Headed to Caroline Street in Midtown Houston

Quote

Current project construction updates include: 

  • Roadway paving activity and sidewalk installations between Hadley Street and Pierce Street
  • Waterline and drainage installation between Gray Street and Pierce Street
  • Rain garden excavations and grading for landscape installations between Elgin Street and Hadley Street.  
  • Traffic signal installations at McGowen Street and Gray Street intersections

Project completion is scheduled for this fall. However, dates are subject to change depending on factors such as weather and other unforeseen barriers to construction. We appreciate the community’s patience with the Caroline Street project. Although TxDOT manages the construction of this project, Midtown will continue working with TxDOT to advocate on behalf of the Midtown community to address the concerns of Midtown residents and property owners.

 

  • Like 3
Link to comment
Share on other sites

According to a friend who owns a house on Caroline, the contractors encountered some unexpected placement of underground utilities where Caroline intersects side streets. (Which underground utilities? Beats me.)
This accounts for part of the delay. He's now being told that the contractor has had to reduce the pace of construction because they didn't anticipate the expense of having to make the corrections to utilities, and it's left them in financial straits. 
What kind of contracts were approved that allow delays after delays? It's been 3+ years since the project began, and there's still no end in sight.

  • Like 2
Link to comment
Share on other sites

10 hours ago, dbigtex56 said:

According to a friend who owns a house on Caroline, the contractors encountered some unexpected placement of underground utilities where Caroline intersects side streets. (Which underground utilities? Beats me.)
This accounts for part of the delay. He's now being told that the contractor has had to reduce the pace of construction because they didn't anticipate the expense of having to make the corrections to utilities, and it's left them in financial straits. 
What kind of contracts were approved that allow delays after delays? It's been 3+ years since the project began, and there's still no end in sight.

I'm not sure how they are still able to lean on that issue, as the whole situation was uncovered during the survey phase. MRA issued a change order a couple years ago (I want to say it was before construction kicked off) that increased the project scope to include the removal of the abandoned utilities.

Nut this whole project has been a joke (both in terms of the MRA and the contractor). I have seen many instances where they poured curbs or sidewalks one week, then their crews have torn it up within a couple weeks. And the architects didn't seem to plan for drainage as some of the curbs don't have sewer openings so they just pool water on the road.

  • Thanks 1
  • Sad 1
Link to comment
Share on other sites

16 hours ago, dbigtex56 said:

According to a friend who owns a house on Caroline, the contractors encountered some unexpected placement of underground utilities where Caroline intersects side streets. (Which underground utilities? Beats me.)
This accounts for part of the delay. He's now being told that the contractor has had to reduce the pace of construction because they didn't anticipate the expense of having to make the corrections to utilities, and it's left them in financial straits. 
What kind of contracts were approved that allow delays after delays? It's been 3+ years since the project began, and there's still no end in sight.

Probably natural gas lines. those things are all over Midtown, and no one is sure which ones are still connected to the active gas grid. When we lived in Midtown, probably 2000 or so, they had a backhoe come in to pull up the gas lines around the electrical substation to the North of Tuam. Backhoe hooked up to a line, started lifting, and not only did a lot more pipe come out of the ground than expected, the line broke, and started spewing gas. Backhoe driver and his buddies bailed, and drove off. I called HFD and Centerpoint, who finally came out and got things shut down.

  • Like 3
  • Thanks 1
Link to comment
Share on other sites

  • 2 months later...
On 5/22/2014 at 6:04 PM, phillip_white said:

Construction on the Caroline Street project is scheduled to start in December 2014.

Happy 7th Anniversary, Caroline Street Project!
So far as I know, most blocks still do not have contiguous sidewalks, the new streetlights aren't functional, the water gardens and landscaping aren't complete, but what the hell...trees have been planted.
Woo-hoo!

  • Like 3
  • Thanks 1
  • Haha 1
  • Sad 3
Link to comment
Share on other sites

On 12/19/2021 at 10:04 AM, dbigtex56 said:

Happy 7th Anniversary, Caroline Street Project!
So far as I know, most blocks still do not have contiguous sidewalks, the new streetlights aren't functional, the water gardens and landscaping aren't complete, but what the hell...trees have been planted.
Woo-hoo!

Imagine how beautiful the trees would be in they had been planted 7 years ago!

  • Like 2
Link to comment
Share on other sites

  • 3 weeks later...

Just drove down Caroline and they are planting trees, and greenery now. Looks like most of the heavy construction is done and they're starting to clean up the street and working on landscaping. The lighting looks really nice. Cant wait to see this finished and Im sure neither can the people who live on this street or have businesses here.

I don't know what the problem with construction was that delayed this for so long but its nice to see them getting to the end.

  • Like 6
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...