Jump to content

JW Marriott At 806 Main St. & Expansion Into Battlestein’s - 812 Main St.


Houston19514

Recommended Posts

  • 1 month later...

A replat named JW Marriott Reserve is under review. 

According to the text on the replat, it's "a partial replat of all of lots 3-5, part of lots 11-12, Block 92 of South Side Buffalo Bayou." The reason for the replat is "to create an unrestricted reserve."

As discussed, JW Marriott Downtown at 806 Main St is expanding. It's renovating the Battelesteins Building next door at 812 Main St. The  plan is to connect the two buildings for the hotel's expansion.

Southwest Value Partners ( SWVP JW Houston LLC ) acquired the Battlesteins Building and JW Marriott Downtown Houston last fall.



Below is the map showing the parcels for 806 Main St and 812 Main St:

VNVhLb1.png




Below are maps showing the requested replat that will combine the 806 Main and 812 Main parcels into one:


PoAEK94.png


Xkx5Lvb.png


 

Edited by IntheKnowHouston
  • Like 2
Link to comment
Share on other sites

A replat named JW Marriott Reserve is under review. 

According to the text on the replat, it's "a partial replat of all of lots 3-5, part of lots 11-12, Block 92 of South Side Buffalo Bayou." The reason for the replat is "to create an unrestricted reserve."

As discussed, JW Marriott Downtown at 806 Main St is expanding. It's renovating the Battelesteins Building next door at 812 Main St. The  plan is to connect the two buildings for the hotel's expansion.

Southwest Value Partners ( SWVP JW Houston LLC ) acquired the Battlesteins Building and JW Marriott Downtown Houston last fall.



Below is the map showing the parcels for 806 Main St and 812 Main St:

VNVhLb1.png




Below are maps showing the requested replat that will combine the 806 Main and 812 Main parcels into one:


PoAEK94.png


Xkx5Lvb.png

 

Link to comment
Share on other sites

2 minutes ago, IntheKnowHouston said:

A replat named JW Marriott Reserve is under review. 

According to the text on the replat, it's "a partial replat of all of lots 3-5, part of lots 11-12, Block 92 of South Side Buffalo Bayou." The reason for the replat is "to create an unrestricted reserve."

As discussed, JW Marriott Downtown at 806 Main St is expanding. It's renovating the Battelesteins Building next door at 812 Main St. The  plan is to connect the two buildings for the hotel's expansion.

Southwest Value Partners ( SWVP JW Houston LLC ) acquired the Battlesteins Building and JW Marriott Downtown Houston last fall.



Below is the map showing the parcels for 806 Main St and 812 Main St:

VNVhLb1.png




Below are maps showing the requested replat that will combine the 806 Main and 812 Main parcels into one:


PoAEK94.png


Xkx5Lvb.png
 





Below is the replat submitted to the city's planning and development department.  The requested replat combines the 806 Main and 812 Main parcels into one:


upPshHm.jpg



crfcZcw.jpg

 

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

  

2 minutes ago, IntheKnowHouston said:

A replat named JW Marriott Reserve is under review. 

According to the text on the replat, it's "a partial replat of all of lots 3-5, part of lots 11-12, Block 92 of South Side Buffalo Bayou." The reason for the replat is "to create an unrestricted reserve."

As discussed, JW Marriott Downtown at 806 Main St is expanding. It's renovating the Battelesteins Building next door at 812 Main St. The  plan is to connect the two buildings for the hotel's expansion.

Southwest Value Partners ( SWVP JW Houston LLC ) acquired the Battlesteins Building and JW Marriott Downtown Houston last fall.



Below is the map showing the parcels for 806 Main St and 812 Main St:

VNVhLb1.png




Below are maps showing the requested replat that will combine the 806 Main and 812 Main parcels into one:


PoAEK94.png


Xkx5Lvb.png
 





Below is the replat submitted to the city's planning and development department.  The requested replat combines the 806 Main and 812 Main parcels into one:


upPshHm.jpg



crfcZcw.jpg

  • Like 5
Link to comment
Share on other sites

  • The title was changed to JW Marriott At 806 Main St. & Expansion Into Battlestein’s (812 Main St.)
  • 1 month later...

The front was boarded up a couple months ago and I haven't noticed any construction workers on site since.  Inside is gutted but with temporary construction lights lit up all the time.  The roof looks a lot cleaner with the chiller mechanisms gone.  Guessing they finished demolition and are waiting to start construction?

fJgBbo4.jpg

  • Like 5
Link to comment
Share on other sites

  • The title was changed to JW Marriott At 806 Main St. & Expansion Into Battlestein’s - 812 Main St.
  • 1 month later...
12 hours ago, Houston19514 said:

https://www.arch-con.com/divisions/hospitality/jw-marriott-houston-downtown-expansion/

72,382-square-foot building conversion to add 56 rooms as well as the demolition and renovation of the storefront, entry vestibule, elevators, ballroom and restrooms on the first floor and meeting rooms on the second floor.


Arch-Con offers the following description of the JW Marriott Hotel Downtown Houston remodel on the website Houston19514 linked above.

Located at 806 Main St, the hotel is expanding into adjacent Battlestein's Building at 812 Main St.


The JW Marriott Houston Downtown Expansion is an adaptive reuse of the historic, 10-story Battlestein’s Building built in 1950. It is adjacent to the existing JW Marriott Houston Downtown, an adaptive reuse of the historic Samuel F. Carter Building built in 1910. Arch-Con’s scope of work includes a 72,382-square-foot building conversion to add 56 rooms as well as the demolition and renovation of the storefront, entry vestibule, elevators, ballroom and restrooms on the first floor and meeting rooms on the second floor. Designed by MCS Architects LLC, project highlights include ribbon windows and a rooftop penthouse, bar and pool.

  • Like 2
Link to comment
Share on other sites

12 hours ago, Houston19514 said:

https://www.arch-con.com/divisions/hospitality/jw-marriott-houston-downtown-expansion/

72,382-square-foot building conversion to add 56 rooms as well as the demolition and renovation of the storefront, entry vestibule, elevators, ballroom and restrooms on the first floor and meeting rooms on the second floor.

 

7 minutes ago, IntheKnowHouston said:

Arch-Con offers the following description of the JW Marriott Hotel Downtown Houston remodel on the website Houston19514 linked above.


The JW Marriott Houston Downtown Expansion is an adaptive reuse of the historic, 10-story Battlestein’s Building built in 1950. It is adjacent to the existing JW Marriott Houston Downtown, an adaptive reuse of the historic Samuel F. Carter Building built in 1910. Arch-Con’s scope of work includes a 72,382-square-foot building conversion to add 56 rooms as well as the demolition and renovation of the storefront, entry vestibule, elevators, ballroom and restrooms on the first floor and meeting rooms on the second floor. Designed by MCS Architects LLC, project highlights include ribbon windows and a rooftop penthouse, bar and pool.



A screenshot of the rendering for the JW Marriott Houston Downtown hotel expansion. The rendering depicts the pool and terrace going in the Battelstein's Building at 812 Main St. Based on the image's url, the rendering was uploaded to Arch-Con's website this month.

JW Marriott Houston Downtown is located at 806 Main St.


rk9Larb.jpeg

Edited by IntheKnowHouston
  • Like 6
  • Thanks 2
Link to comment
Share on other sites

  • 2 weeks later...

The city cited 812 Main St for unpermitted work last week.

As mentioned, the Battlestein's Building at 812 Main St is being redeveloped. It's part of the expansion of the JW Marriott Houston Downtown at 806 Main St.

Below are the inspector's note from the 311 complaint for unpermitted work at 812 Main St:


Upon return to 812 Main St. I37 met with Mgr of Marriott Hotel, explained requesting access to adjacent building for Inspection. spoke with Maint. Mgr. to gain access. I37 inspected and took photos of Basement, 10 floors and roof of building. observed non-function water pump in basement, and every floor was vacant Temp electrical stations on every floor. all elevator doors were secured.  Remodel permit is required for all renovations. with all Trades. All work must stop till further notice from Building Official as well as Fire Marshal.

https://houston311.powerappsportals.us/en-US/checkcasestatus/casedetail/?id=e2514c14-23e6-ee11-904d-001dd80b3d80

  • Like 1
Link to comment
Share on other sites

An impact water fee permit and impact wastewater fee permit (water/waste water application) were purchased last week for 812 Main St.

The Battlestein's Building at 812 Main St is part of expansion plans for JW Marriott Houston Downtown at 806 Main St.



Impact water fee

GbvEeeu.png

 

 

Impact wastewater fee

8Tfcaap.png

  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...