DrLan34 1709 Posted November 5, 2015 (edited) Taking down the top floor framing Edited November 6, 2015 by DrLan34 3 Share this post Link to post Share on other sites
DrLan34 1709 Posted November 5, 2015 (edited) - Edited November 5, 2015 by DrLan34 Share this post Link to post Share on other sites
Howard Huge 2274 Posted November 6, 2015 So is this one rockin' and rollin' again? This one came to a screeching halt awhile back didn't it? Share this post Link to post Share on other sites
skwatra 397 Posted November 6, 2015 A few months back things had really slowed down. Definitely a week or two straight with no activity that I noticed (I live a few blocks away). Over the last month or so there the work has picked up. They have been closing one lane on W Gray pretty regularly and trucks have been going in and out. And their staging area has had plenty of material come in and out. Share this post Link to post Share on other sites
Avossos 1099 Posted November 6, 2015 There are some windows up. Share this post Link to post Share on other sites
Urbannizer 33964 Posted November 22, 2015 Houstonia by UiBriain!, on Flickr 8 Share this post Link to post Share on other sites
DrLan34 1709 Posted December 4, 2015 Down to the third residential floor on the second building. I heard they will stop deconstructing at this floor and then start going vertical again... let's see 4 Share this post Link to post Share on other sites
Urbannizer 33964 Posted December 7, 2015 Via Flickr: Houston by UiBriain!, on Flickr 9 Share this post Link to post Share on other sites
DrLan34 1709 Posted December 12, 2015 West building is going back up again. They were working on the fourth floor elevator shaft today. Share this post Link to post Share on other sites
hindesky 19973 Posted December 12, 2015 East building 6 Share this post Link to post Share on other sites
DrLan34 1709 Posted December 31, 2015 West building going vertical again. 4 Share this post Link to post Share on other sites
Urbannizer 33964 Posted December 31, 2015 Nearly 2 years later and this one is still u/c, moving at a slower pace than Block 334 if you ask me. Share this post Link to post Share on other sites
DrLan34 1709 Posted January 24, 2016 (edited) Taken 1/23/16 West building Edited August 10, 2016 by DrLan34 2 Share this post Link to post Share on other sites
hindesky 19973 Posted January 24, 2016 One of the two tower cranes came down today. 5 Share this post Link to post Share on other sites
DrLan34 1709 Posted February 7, 2016 (edited) - Edited August 10, 2016 by DrLan34 4 Share this post Link to post Share on other sites
Avossos 1099 Posted February 7, 2016 Dolce and Proguard.PNGThis will be hideous... Share this post Link to post Share on other sites
terra002 122 Posted February 10, 2016 This will be hideous... Storage facilities are inherently hideous. Such a miss not having any ground floor retail at either place. Look how well it's done for the Post. Share this post Link to post Share on other sites
DrLan34 1709 Posted February 10, 2016 (edited) - Edited February 27, 2016 by DrLan34 Share this post Link to post Share on other sites
Chi-Char-Hou-Dal 335 Posted March 23, 2016 is this thing dead? sometimes I see like one worker - might need some HAIF'ers to come help hammer some nails. Share this post Link to post Share on other sites
terra002 122 Posted March 23, 2016 1 hour ago, Chi-Char-Hou-Dal said: is this thing dead? sometimes I see like one worker - might need some HAIF'ers to come help hammer some nails. The website is down http://dlcresidential.com/communities/dolce-living-midtown-texas/ Share this post Link to post Share on other sites
skwatra 397 Posted March 24, 2016 6 hours ago, Chi-Char-Hou-Dal said: is this thing dead? sometimes I see like one worker - might need some HAIF'ers to come help hammer some nails. hopefully he's not welding alone... (too soon?) Share this post Link to post Share on other sites
hindesky 19973 Posted March 27, 2016 The sign ought to read "NO Construction Zone" appears nothing has changed here. These guys make Block 334 look like greased lightning. 5 Share this post Link to post Share on other sites
skwatra 397 Posted March 29, 2016 Noticed the sign on west gray westbound just before Dolce is updated to say "Lane Closures April 4 to May 4" i believe are the dates. So hopefully that is for Dolce, though could be for Proguard working on the sidewalk in front of their location. Share this post Link to post Share on other sites
skwatra 397 Posted April 8, 2016 Lane closures were for CoH roadwork on W Gray. No signs of any progress at Dolce... haven't seen a worker there for weeks. 1 Share this post Link to post Share on other sites
DrLan34 1709 Posted April 8, 2016 I see people there daily but it is only a few. They have been finishing up the wood frame on the west building the past few days. 1 Share this post Link to post Share on other sites
DrLan34 1709 Posted April 30, 2016 They are starting to take down the west building crane today. 1 Share this post Link to post Share on other sites
hindesky 19973 Posted May 1, 2016 The west building looks at a standstill and the eastern is going slow as molasses, these guys make block 334 look like a roadrunner. west east 6 Share this post Link to post Share on other sites
DrLan34 1709 Posted May 5, 2016 (edited) This is what I understand about the status of the project at this time: West Building: - Due to heavy rain last year, the top two floors had to be deconstructed and replaced, along with all the siding. - Nearly all "fixes" are complete, with some small additional work on the roof required. - Currently waiting on permits to begin substantial work again. East Building: - Similar issues, but farther along. - At this time, they are working on permits floor by floor. - Top floor just received permits for plumbing/electrical and they just started installing that equipment. - They will work their way down as the permits come through. Edited May 31, 2016 by DrLan34 7 Share this post Link to post Share on other sites
HoustonMidtown 2848 Posted May 15, 2016 A couple pics of the back of the development 4 Share this post Link to post Share on other sites
DrLan34 1709 Posted June 20, 2016 Tyvek is being installed on the west side building along with some windows. Some movement. 5 Share this post Link to post Share on other sites
DrLan34 1709 Posted July 25, 2016 Facade work on the east building. 1 Share this post Link to post Share on other sites
DrLan34 1709 Posted August 10, 2016 (edited) Prepping for the facade. Edited October 4, 2016 by DrLan34 9 Share this post Link to post Share on other sites
quietstorm 1075 Posted August 11, 2016 7 hours ago, DrLan34 said: Prepping for the facade. The scale of this building is "off" to me, especially in comparison to Post Midtown a few blocks away as well as the fairly new Pearl Midtown on Smith. 1 Share this post Link to post Share on other sites
H-Town Man 2408 Posted August 12, 2016 The fail is strong with this one. Share this post Link to post Share on other sites
HoustonMidtown 2848 Posted August 28, 2016 Stucco on the east side 4 Share this post Link to post Share on other sites
DrLan34 1709 Posted September 25, 2016 (edited) - Edited October 24, 2016 by DrLan34 4 Share this post Link to post Share on other sites
DrLan34 1709 Posted October 10, 2016 (edited) Getting back to it: Edited October 24, 2016 by DrLan34 9 Share this post Link to post Share on other sites
hindesky 19973 Posted December 25, 2016 I wonder what the story is behind this building? Only 2 guys must be working on it, the eastern building is starting to look in disrepair already. Hines could have built a 200 story building in the time it's taking these guys. I wonder if they are hoping for a insurance payout. 9 Share this post Link to post Share on other sites
DrLan34 1709 Posted January 7, 2017 (edited) East building has a sign up that says "Now Leasing" and there is a new rendering on the website. DolceMidtown.com Edited February 5, 2017 by DrLan34 10 Share this post Link to post Share on other sites
HoustonMidtown 2848 Posted February 18, 2017 Works continues....at a snail's pace... 9 Share this post Link to post Share on other sites
phillip_white 933 Posted February 20, 2017 Remember when we thought Block 334 was taking forever to complete? I think this one has it beat. 6 Share this post Link to post Share on other sites
terra002 122 Posted February 20, 2017 $1825 for a 800Sqft apt. You've got to be kidding me. 1 Share this post Link to post Share on other sites
Montrose1100 2763 Posted February 20, 2017 7 hours ago, terra002 said: $1825 for a 800Sqft apt. You've got to be kidding me. Southmore has the audacity to charge almost $3,500 for a 1 bedroom ~ 1,000square feet. 1 Share this post Link to post Share on other sites
cspwal 2179 Posted February 20, 2017 It better come with a maid and butler 2 Share this post Link to post Share on other sites
skwatra 397 Posted March 14, 2017 They put down all the framework and rebar and actually laid some sidewalk today along Gray. Progress, but the facade of the western buildings hasn't been touched so I assume the fencing will remain up for some time and the new sidewalk won't be accessible. 3 Share this post Link to post Share on other sites
AREJAY 922 Posted March 21, 2017 http://swamplot.com/dolce-midtown-on-w-gray-now-talking-leasing-as-apartments-enter-38th-month-of-construction/2017-03-21/ 5 Share this post Link to post Share on other sites
cspwal 2179 Posted March 21, 2017 Two construction workers! They've doubled their workforce! 3 Share this post Link to post Share on other sites