-
Posts
21,335 -
Joined
-
Last visited
-
Days Won
1,425
Content Type
Profiles
Forums
Events
Everything posted by hindesky
-
They've made a lot of progress.
- 29 replies
-
- 6
-
- brownstone group
- multifamily
- (and 3 more)
-
- 98 replies
-
- 5
-
- multifamily
- fairfield residential
-
(and 2 more)
Tagged with:
-
- 118 replies
-
- 2
-
- the heights
- self storage
-
(and 2 more)
Tagged with:
-
Crawler crane is gone, they are hanging the metal framing for the walls.
-
East side of the eastern building.
- 1,109 replies
-
- 10
-
- alliance residential
- retail
-
(and 4 more)
Tagged with:
-
It got a sign.
- 107 replies
-
- 5
-
- downtown
- edi international
-
(and 2 more)
Tagged with:
-
Looks like they are working on the outer perimeter wall foundation.
- 411 replies
-
- 8
-
- urban genesis
- downtown
-
(and 3 more)
Tagged with:
-
City View Lofts Phase II: Multifamily At 21 Chenevert St.
hindesky replied to Highrise Tower's topic in Going Up!
Most times when I go by here I see zero progress, this time they have the piping laid in the ground and are pouring concrete for the slab.- 73 replies
-
- 7
-
- downtown
- multifamily
-
(and 2 more)
Tagged with:
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
hindesky replied to largeTEXAS's topic in Downtown
Looks like when the tower crane hoist buckets of concrete it leaks concrete laden water on the Hampton Inn hotel next door. Curious if Andres construction will have to pay to clean this up? The shipyard I worked at once painted a tower crane they bought, it was green and they had it painted it bright yellow. The overspray drifted south during a strong north wind. It got all over a black wrought iron fence and the black hearse from a funeral home next to our yard. Our painters had to repaint the fence and removed the yellow paint from the hearse at our expense.- 1,224 replies
-
- 8
-
- multifamily
- ziegler cooper
- (and 4 more)
-
- 1,094 replies
-
- 15
-
- michael hsus
- office
-
(and 4 more)
Tagged with:
-
Parc Binz I & II: Offices With Retail At Binz And Chenevert St.
hindesky replied to ChannelTwoNews's topic in Going Up!
Drilling foundation piles.- 164 replies
-
- 7
-
- museum district
- retail
- (and 3 more)
-
Every building on that block has a "Pending" on it except the 7-11 convenience store in the current HCAD. Even those further west on 59/69 including the Chelsea and the Carter. I wonder what that means?
-
They have already picked Charlie Pallilo's replacements, Vanessa Richardson and Paul Gallant. https://www.chron.com/sports/article/Vanessa-Richardson-Paul-Gallant-Charlie-Pallilo-FM-16844581.php
- 20 replies
-
- 1
-
- josh innes
- kmbe 790 am
- (and 3 more)
-
-
This is a portion of the presentation given in Monday's meeting...... https://www.letstalkhouston.org/11th-street-bikeway https://ehq-production-us-california.s3.us-west-1.amazonaws.com/514dbd76ba9a6e90abd7943977b00ecef78a1275/original/1644339537/e3ea50ae52fa06542ceedb2bf0b34366_11thStreet_HeightsLandUseMeeting_02072022.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Credential=AKIAIBJCUKKD4ZO4WUUA%2F20220209%2Fus-west-1%2Fs3%2Faws4_request&X-Amz-Date=20220209T071545Z&X-Amz-Expires=300&X-Amz-SignedHeaders=host&X-Amz-Signature=e456de4eb1618949c3208bf455587c510599e9773e154d4e798c5c07d5e941e1
-
-
- 113 replies
-
- 5
-
Caroline Lofts: Affordable Housing At 2403 Caroline St.
hindesky replied to CrockpotandGravel's topic in Going Up!
- 164 replies
-
- 6
-
- multifamily
- affordable housing
- (and 3 more)
-
- 2,266 replies
-
- 16
-
- houston methodist
- technology
-
(and 5 more)
Tagged with:
-
Steel starting to go up.
- 360 replies
-
- 4
-
- big tex storage
- montrose
-
(and 2 more)
Tagged with:
-
And it has damns on both ends which helps to minimize the amount of silt in it. They just pumped the water out and removed all the debris in it a couple weeks ago. They do this biannually. https://www.ksat.com/news/local/2022/01/25/cellphones-chairs-found-as-san-antonio-river-is-drained-cleaned/
- 1,574 replies
-
- 9
-
Charlie Pallilo has confirmed he is out at 97.5 FM. https://www.houstonchronicle.com/texas-sports-nation/general/article/Sports-talk-radio-host-Charlie-Pallilo-parts-ways-16842165.php
- 20 replies
-
- 1
-
- josh innes
- kmbe 790 am
- (and 3 more)
-
Astra Tower, a 40-story luxury residential high-rise that will become Salt Lake City’s tallest tower, has officially broken ground at 200 S. State Street. The HKS-designed project will include 372 luxury home apartments for rent. Units will be offered in studio, one-, and two-bedroom options. Additionally, two levels will be set aside for penthouse units. https://www.bdcnetwork.com/astra-tower-will-be-salt-lake-citys-tallest-high-rise?oly_enc_id=9107D0450578D1S