Jump to content

hindesky

Subscriber
  • Posts

    21,566
  • Joined

  • Last visited

  • Days Won

    1,435

Everything posted by hindesky

  1. Fence is down and someone might be working on the inside.
  2. Building demo permits for the 3 buildings. Betting it will be townhomes.
  3. Looks like Buffalo Bayou Partnership might be buying the property from Souther Pacific Railroad. The bayou trail crossing bridge will be very close to it. https://www.dropbox.com/s/52mn4vpud8lg0kn/Buffalo Bayou East Master Plan.pdf?dl=0
  4. https://www.dropbox.com/s/52mn4vpud8lg0kn/Buffalo Bayou East Master Plan.pdf?dl=0 The bike trail bridge crossing location taken from the Buffalo Bayou East Master Plan.
  5. Berkadia Houston Construction Report 1Q'23 https://base.berkadia.com/wp-content/uploads/2023/05/1Q23-Houston-Construction-Pipeline-Report.pdf
  6. https://www.studioredarchitects.com/work/episcopal-high-school-visual-and-performing-arts-center/
  7. Black fence netting is back up. There are now 6 portable solar light towers.
  8. They are jumping the tower crane 7 sections. 1 is being installed right now and 6 more on the ground. I was talking with a Keystone worker who was rigging the sections up. He said about 10 of his crew is going to Methodist North project next week. He said the plumbers are the ones who hit the high pressure gas pipe on Monday while attempting to install some pipe. It's super hazy due to the smoke from the fields the farmers are burning in southern Mexico.
  9. Grant MacKay got the contract to take it down. They have an excavator with a long reach boom on it. Salvaging some statues and other parts of the building. https://www.grantmackaydemolition.com
×
×
  • Create New...