Regions Financial Center: Mixed-Use At 3773 Richmond Ave.


Recommended Posts

  • 2 weeks later...

richmond-cummins-demo-corner.jpg

THIS WAS THE scene yesterday on the southeast corner of Richmond Ave and Cummins St. near Greenway Plaza, where the Redstone Companies and Hansen Partners are planning to build a new 11-story office building and 5-level parking garage with — if a Planning Dept. staff report describing the project is correct — an attached 5-story retail center. The development received planning commission approval last week for a reduced setback along the 2 streets that meets with planned but not-yet-approved standards for transit corridors; if Metro’s stalled University Line ever gets built, it’ll make its get-off-of-Richmond turn at this same corner. Accordingly, in documents submitted to the city, the developers appear to be holding out the undescribed retail portion for some later date: [Only] “the office building and related parking garage to be built on this site are nearing the time that a building permit will be required,” the variance application reads.

richmond-cummins-demo-1.jpg

richmond-cummins-demo-dirt.jpg

http://swamplot.com/where-on-richmond-ave-that-new-greenway-plaza-office-tower-is-going/2013-12-11/

Edited by Urbannizer
  • Like 4
Link to comment
Share on other sites

  • 5 months later...
  • 3 months later...

Was driving by this morning. I saw they had put building markers (wooden stacks with pink ribbon) on the ground. I work in greenway plaza and walk by this way everyday to get lunch so something is going on. I think this one is finally moving forward. Will confirm with a pic maybe tomorrow.

Link to comment
Share on other sites

I had totally forgot about this. Is this up to the street like it looks and not surrounded by parking lots? If so, this is 100 times nicer then being a BLVD Place junior. 

 

Its all the way up to the street and all parking is in a parking garage at the back of the building which will be accessible by Portsmouth street.

Edited by Luminare
  • Like 1
Link to comment
Share on other sites

  • 1 month later...

LOL, they have received violation notices at least three times over the past 6 months.  Twice the brush was over 7 feet high on the property.  I walked by today... there was a guy out there doing some survey work.  Also, it looks like the city put up about a dozen violation signs around the property.  

  • Like 2
Link to comment
Share on other sites

  • 1 month later...
  • 3 weeks later...

Does anyone have information about the new building going up at Richmond and Cummins in Greenway Plaza next to Soap Car Wash?  I noticed a fence went up and there is a construction trailer on site.   There is a rendering that I found, but I am not sure if it's current.

 

Here are details from Swamplot earlier in 2014:  

 

richmond-cummins-demo-corner.jpg

 

This was the scene yesterday on the southeast corner of Richmond Ave and Cummins St. near Greenway Plaza, where the Redstone Companies and Hansen Partners are planning to build a new 11-story office building and 5-level parking garage with — if a Planning Dept. staff report describing the project is correct — an attached 5-story retail center. The development received planning commission approval last week for a reduced setback along the 2 streets that meets with planned but not-yet-approved standards for transit corridors; if Metro’s stalled University Line ever gets built, it’ll make its get-off-of-Richmond turn at this same corner. Accordingly, in documents submitted to the city, the developers appear to be holding out the undescribed retail portion for some later date: [Only] “the office building and related parking garage to be built on this site are nearing the time that a building permit will be required,” the variance application reads.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...