Urbannizer Posted May 3, 2024 Posted May 3, 2024 First rendering was posted before, the second is new to our eyes. 2 2 Quote
LosFeliz Posted May 4, 2024 Posted May 4, 2024 On 5/3/2024 at 2:16 AM, Urbannizer said: Just wanted to bump this to the new page. Is this really happening? Love this new glass wall view. 4 Quote
hindesky Posted May 9, 2024 Posted May 9, 2024 Looks like they are bringing dirt now after removing the sand. 7 Quote
Bassclef Posted May 10, 2024 Posted May 10, 2024 On 5/4/2024 at 12:56 PM, LosFeliz said: Just wanted to bump this to the new page. Is this really happening? Love this new glass wall view. Not happening. 11 hours ago, hindesky said: Looks like they are bringing dirt now after removing the sand. They will probably put something stupid like low rise apartments there, you know how Houston does. 1 Quote
Big E Posted May 13, 2024 Posted May 13, 2024 On 5/10/2024 at 5:24 AM, Bassclef said: Not happening. I mean, site work for the construction has already started. Pretty sure its happening at this point. If we were still in the planning stages, that would be different. 6 Quote
hindesky Posted June 1, 2024 Posted June 1, 2024 The orange excavator was headed to the gate on Asbury St., I showed the operator what was proposed to be built here because he had no idea what this property was going to be for. 8 Quote
bobruss Posted June 1, 2024 Posted June 1, 2024 Bassclef why so much negativity? St Regis isn't going to back out of this. I take it from your moniker you play the bass, so you should get on the upbeat! 3 1 1 1 Quote
hindesky Posted June 15, 2024 Posted June 15, 2024 The foreman building the new Comerica Bank across Memorial Dr. said the dump trucks come and go all day long bringing and taking dirt. While I was talking with him 4 of them showed up. 9 Quote
hindesky Posted June 22, 2024 Posted June 22, 2024 Dump trucks coming and going 6 days a week. Taking sand, gumbo soil and bringing dirt that can be compacted. 9 Quote
hindesky Posted June 26, 2024 Posted June 26, 2024 St. Regis Sales Center. https://srresidenceshouston.com Architect - https://www.kirksey.com 7 Quote
LosFeliz Posted June 26, 2024 Posted June 26, 2024 Ugh. I get it. Visibility of Memorial. But terrible to see these trees lost for a trailer. 5 Quote
Popular Post Paco Jones Posted August 16, 2024 Popular Post Posted August 16, 2024 Hoping to have more information soon. 16 Quote
Popular Post Urbannizer Posted August 24, 2024 Popular Post Posted August 24, 2024 https://srresidenceshouston.com/ 14 2 Quote
Popular Post Paco Jones Posted September 5, 2024 Popular Post Posted September 5, 2024 102 Asbury Street Houston, Texas 77007 OWNER: Satya Inc. DESIGN CONSULTANT: Pickard Chilton EXECUTIVE ARCHITECT: Kirksey INFO: 37 stories, 8 levels of parking, total of 95 units. Anticipated to start in Q3 of 2025. 24 1 Quote
Triton Posted September 6, 2024 Posted September 6, 2024 2 hours ago, Paco Jones said: 102 Asbury Street Houston, Texas 77007 OWNER: Satya Inc. DESIGN CONSULTANT: Pickard Chilton EXECUTIVE ARCHITECT: Kirksey INFO: 37 stories, 8 levels of parking, total of 95 units. Anticipated to start in Q3 of 2025. Interesting that the schematics include the new Buffalo Bayou trails to Memorial Park. 2 Quote
Popular Post Urbannizer Posted September 9, 2024 Popular Post Posted September 9, 2024 I’m not excited with the changes to the podium. Have a feeling it will not turn out well. Other than that, this is a gorgeous building. 11 Quote
Popular Post hindesky Posted September 17, 2024 Popular Post Posted September 17, 2024 This looks to be the area for the sales office. 11 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.