Jump to content

Advantage BMW Midtown At 1305 Gray St.


Jax

Recommended Posts

  • 1 month later...

I thought the dealership was suppose to be building a new facility on the block that is now paved, fenced and landscaped. Granted the block looks better than before, but a new building would have been better. Anybody know why they are not building?

  • Like 1
Link to comment
Share on other sites

They are indeed building. Not sure which block you are referring too. But they are building directly across the street from their current showroom, towards 45. The 2nd story showroom will be visible as you are driving on the Pierce Elevated.

They have paved and fenced in the block between Gray & pierce that is directly across from the showroom. I wonder if they are tearing down the used sales building to build the 2 story building.

  • Like 1
Link to comment
Share on other sites

  • 4 months later...

Being guilty of being a HAIFer, I drove by this site in downtown a few days ago, but haven't been able to find if we talked about it, is something significant going on? It's nothing but dirt at the moment, but I THINK (as I was Speeding like a madman) I saw some piping sticking up from the ground.

Anyone?

  • Like 1
Link to comment
Share on other sites

"New Auto Dealer Showroom" for Advantage BMW

Project No:

08001245

Date:

2/18/2008

USE:

NEW AUTO DEALER SHOWROOM 1-2-2-B-B 100% SPR. 2003 IBC

Owner / Occupant:

ADVANTAGE BMW

Job Address:

1305 GRAY ST

Buyer:

WIER ENTERPRISES

Address:

724 w 20TH ST 77008

Phone:

7138021473

  • Like 1
Link to comment
Share on other sites

  • 1 month later...
  • The title was changed to Advantage BMW Midtown At 1305 Gray St.
  • The title was changed to Advantage BMW Midtown At 1305 Gray St.
  • 1 month later...
  • 1 month later...

  

On 8/28/2023 at 2:21 PM, hindesky said:

Architect - https://sparc-plus.com

M29CGDh.pngqeBKUPp.png




Following the August architectural barriers projects filing with the Texas Department of Licensing and Regulation ( TDLR), a plan review fee permit was filed today for 1305 Gray St. As mentioned previously, this is for the Advantage BMW dealership.


From the permit:

  • Use: New, automotive dealership



M8kYp8d.png

Edited by IntheKnowHouston
  • Like 1
Link to comment
Share on other sites

  • 7 months later...
  • 2 months later...
  • 2 weeks later...
On 9/14/2024 at 12:24 PM, hindesky said:

I wonder if they are going to demo the building and build a brand new 3 story showroom or renovate the existing building?



A plumbing permit was pulled yesterday for 1305 Gray St.


Details from the permit:

  • Use: Demo building / sewer disconnect
  • FCC Group: Demo; other building(s)


The permit is in preparation of the demolition of an existing building on the Midtown property. Advantage BMW is constructing a new "three-story construction showroom," as stated in the TDLR / architectural barriers project filing previously posted.


sftdXhh.png

  • Like 1
Link to comment
Share on other sites

A planning development permit was acquired yesterday for 1305 Gray St.

Details from the permit:

  • Use: 14,845 sf dealership w/ sitework 1-3-2-S1/S2/B-B-SPK/FA '15 IBC
  • FCC Group: Other non-residential building(s)


Advantage BMW is constructing a new "three-story construction showroom," as stated in the TDLR / architectural barriers project filing.


2oBReRo.png

Edited by IntheKnowHouston
Link to comment
Share on other sites

On 9/27/2024 at 5:12 AM, IntheKnowHouston said:

A plumbing permit was pulled yesterday for 1305 Gray St.

Details from the permit:

  • Use: Demo building / sewer disconnect
  • FCC Group: Demo; other building(s)


The permit is in preparation of the demolition of an existing building on the Midtown property. Advantage BMW is constructing a new "three-story construction showroom," as stated in the TDLR / architectural barriers project filing previously posted.


sftdXhh.png




Demolition permit was acquired today for 1305 Gray St.

Details from the permit:

  • Use: Demo building / sewer disconnect
  • FCC Group: Demo; other building(s)


The permit pertain to the impending demolition of an existing building on the Midtown property.

Advantage BMW is constructing a new "three-story construction showroom," as stated in the TDLR / architectural barriers project filing.


UVv9TGR.png


 

Edited by IntheKnowHouston
  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...