Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation since 11/24/2016 in all areas

  1. Quick search does wonders. :) http://test21.kalibratecms.com/
    49 points
  2. New rendering on Transwestern's website. https://transwestern.com/property/the-ro-00
    45 points
  3. https://www.chron.com/business/real-estate/article/Kimpton-Hotels-to-open-first-Houston-property-in-14488855.php
    45 points
  4. PROJECT: River Oaks Multifamily (assigned prelim name) ADDRESS: 1414 Waugh Houston, TX 77019 ARCHITECT: Page OWNER / DEVELOPER: Camden Securities Company INFORMATION: 34 floor residential high-rise tower containing 302 apartments with attached 6 level parking garage for 460 cars with amenity deck on roof. It will sit on the block bounded on the four sides by Waugh Drive, Bell Avenue, Rosine Street, and Pierce Avenue. The tower is approximately 594,826 gross square feet and the tower balconies are approximately 53,020 gross square feet. The parking garage is approximately 199,290 gross square feet. Residential floors will typically have private unit balconies on east and west elevations. Ground Floor areas will include the main lobby, building tenant services, office areas, fire command, security, mail room, maintenance, storage, loading dock, building fire and domestic water room, emergency generator, building electrical rooms, and drive through drop-off/delivery roadway. Tower level 6 is a tenant amenity floor containing fitness, recreation, socializing and workspaces for tenants. Contiguous with this floor level is the top of the parking garage where there will be 29,800 square feet of exterior tenant amenity spaces such as a lap pool, spa, lawn decks, paved decks, walking paths, fitness areas, and covered lounge areas. There is also a 2,063 square foot amenity deck at level 31 for social gatherings. The staggered picture frames on the exterior of the building will be translucent glass with internal LED lighting while the perimeter of the building elevations will be porcelain paneling. I have no information on the other phases except that a mid-rise / tower will be north of this one, between Bell and Clay.
    44 points
  5. Height: 468’ Work begins 4/20, light one up for this one 😆 https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=430526526&row=2
    42 points
  6. https://www.instagram.com/tommytenzo/
    42 points
  7. I bring you all news of a beautiful building with tons of GRF. Happy Friday, everyone! Project: Farb Hyde Park Architect: Ziegler Cooper Information: 20-story residential tower comprised of 256 units for a total of 541,657 S.F. Level 1 is Leasing and a whopping 12,185 S.F. of GFR. Parking is at Levels 2-6 while Levels 7-20 are residential. A 19,000 S.F. outdoor terrace deck and 4,500 S.F. indoor amenity area are located at Level 7.
    41 points
  8. Did some quick photoshop during my break of both Hanover and GID put together. Existing Conditions: Full Build Out of both Develepments: Now that is pretty incredible when you see the whole picture like this.
    41 points
  9. Hello everyone. This project, the Parcel 1 phase, will break ground before the end of the year (likely within the next couple months). TW is currently finalizing contracts with a general contractor.
    40 points
  10. Address: 3120 Buffalo Speedway Architect: The Preston Partnership Information: Residential tower consisting of 28 levels above grade with one level of below grade basement. Parking is at basement and levels 1-5 and residential is levels 6-28. 317 units with a total of 378,387 SF of residential space. Ground floor retail space of 15,209 SF.
    40 points
  11. https://iondistrict.com/#section-3 https://www.smartcitiesworld.net/news/smart-city-district-gets-green-light-from-city-of-houston-7135
    40 points
  12. Project: Hanover Buffalo Bayou Address: 707 Marston Architect: SCB (Solomon Cordwell Buenz) Information: A 317 unit residential tower consisting of 40 stories and two levels of basement parking. Pet Spa and outdoor Pet Run at Level 2. Outdoor amenity deck and swimming pool at Level 10. Project completion date of July 2025. Building Break Down: 2 Levels of Basement Parking Approximately 5,000 SF of ground level retail space Parking at Levels 1-9 Residential at Levels 10-40 484,777 SF Building 241,227 SF Garage (554 spaces)
    39 points
  13. https://www.highstreetresidential.com/en/portfolio/block-98 42-stories, 2Q 2022 completion
    39 points
  14. Sorry for the delay! Was this what you had in mind, @bobruss?
    39 points
  15. 37 points
  16. Project: Tower A (Hotel and Condos) Address: 2701 Main Street Houston, TX 77002 Architect: Preston Partnership Information: A 32-story hotel/condo with exterior amenities at levels 9 and 32. Hotel restaurant/bar (3,200 SF), co-working area with conference room (1,200 SF), and 1,165 SF of retail at level 1 Parking at levels 2 - 6 Ballrooms at level 7 Fitness at level 8 Outdoor dining, dog run, and yoga at level 9 along with two swimming pools Outdoor garden area and pool at level 32 183 hotel units (level 10 - level 18) 191 condo units (level 9 and level 19 thru level 32) 558,000 total square foot Future tower at Fannin side.
    37 points
  17. 37 points
  18. Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr Memorial Park expansion by Marc longoria, on Flickr
    36 points
  19. Eastern Glades was open to the public today. It was kind of empty of people because it was raining, but I would imagine this will attract quite a crowd when the weather starts getting cooler. Very nice addition to Memorial Park.
    36 points
  20. New renderings have been posted. https://www.tmc.edu/tmc3/
    36 points
  21. Had a chance to view these renderings. This building will have even more terraces than Texas Tower. I think this forum will be very impressed by the redesign. High quality project - hopefully it gets capitalized!
    36 points
  22. Found a render that may be more palatable to the local community:
    36 points
  23. The RO, Phase I http://www.spearstreetcapital.com/portfolio/owned/
    36 points
  24. Early 2020 construction start http://www.spearstreetcapital.com/portfolio/owned/
    35 points
  25. Enrique's pictures made me want to go get some shots so I decided to drive into town tonight...terrible idea but here's one that came out after I played with the colors some.
    35 points
  26. Now on Medistar's website: https://www.medistarcorp.com/in-development/
    34 points
  27. Groundbreaking set for next month, 324-unit apartment tower as phase I: @CREguy13 @swtsig https://www.costar.com/article/858316108/developers-prepare-to-break-ground-on-houston-project-with-multiple-skyscrapers
    34 points
  28. 33 points
  29. “The development will include a high-end, 4-star hotel, but the team has yet to secure a brand for the hotel, Crane said. The entertainment district is slated to include restaurants and an indoor tailgating area that can be used year-round. It will also include a walkway above the street, which will take guests directly to the club level of the ballpark. The organization has hired an architecture firm and construction company for the project, Crane said, but the team did not confirm which companies it's working with prior to publication. Crane said the organization hopes to break ground on the project following the conclusion of the Astros’ season and that it could take about three years to complete. He added that the team might build the development in phases, with some parts of the entertainment district opening sooner than others”
    33 points
  30. https://global-uploads.webflow.com/5f6bc5ab851aeae5c2a901df/600b266f2df613343d6f919d_191219 Levy Park Tower at Kirby Grove Leasing Brochure_Reduced.pdf
    33 points
  31. The glass on the garage is starting to be installed.
    33 points
  32. Midtown is going wild. 30-story residnetial high-rise with ~10,000 sq feet of retail (former SEARCH Homeless Services site).
    33 points
  33. Minute Maid Park from the East End by Arie, on Flickr
    33 points
This leaderboard is set to Chicago/GMT-05:00
×
×
  • Create New...