Popular Post Paco Jones Posted November 6, 2020 Popular Post Share Posted November 6, 2020 Project Midtown Building Address 3310 Travis Street Houston, TX 77006 Architect HALFF Owner Travis Partners Capital, LLC. Information This project is a new 6-story midrise building (approx. 23,200 sf) that will be connected to an existing 2 story building on the NW corner of Travis and Francis streets in Midtown. Levels 1-5 consists of office space while level 6 has Kitchen/Bar/Lounge (enclosed) with an outdoor terrace. 28 Quote Link to comment Share on other sites More sharing options...
H-Town Man Posted November 6, 2020 Share Posted November 6, 2020 I guess Link Crude Resources and McQuilling Partners are the anchor tenants. Probably not a whole lot of spec space given the current market. Good infill right there, west side of Travis is pretty ragtag. 1 Quote Link to comment Share on other sites More sharing options...
monarch Posted November 6, 2020 Share Posted November 6, 2020 ^^^ really cool edifice. perfect for MIDTOWN. 2 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted October 2, 2021 Share Posted October 2, 2021 This one got redesigned. Crude Resources backed out but McQuilling Partners stayed on? It is now 3 stories and a different architect. 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted October 10, 2021 Share Posted October 10, 2021 (edited) I live pretty close to this so I can update when work breaks out. This is the current building and it's pretty small. Edited October 10, 2021 by hindesky 4 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted December 22, 2021 Share Posted December 22, 2021 Demolition permit issued by JTB Demolition. 3 1 Quote Link to comment Share on other sites More sharing options...
j_cuevas713 Posted December 22, 2021 Share Posted December 22, 2021 On 11/6/2020 at 11:12 AM, Paco Jones said: Project Midtown Building Address 3310 Travis Street Houston, TX 77006 Architect HALFF Owner Travis Partners Capital, LLC. Information This project is a new 6-story midrise building (approx. 23,200 sf) that will be connected to an existing 2 story building on the NW corner of Travis and Francis streets in Midtown. Levels 1-5 consists of office space while level 6 has Kitchen/Bar/Lounge (enclosed) with an outdoor terrace. THIS is the type of stuff we need in Midtown. Great out of the box design. 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted January 6, 2022 Share Posted January 6, 2022 Building is gone, seems like 80% of the lot was parking lot. 3 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted March 3, 2022 Share Posted March 3, 2022 Way worse than we thought. Talk about value engineering. Architects - https://powersbrown.com GC - https://www.arch-con.com Ground breaking ceremony. 4 3 Quote Link to comment Share on other sites More sharing options...
Popular Post JBTX Posted March 3, 2022 Popular Post Share Posted March 3, 2022 I am once again requesting a built in vomit emoji/reaction. 9 5 Quote Link to comment Share on other sites More sharing options...
hindesky Posted March 3, 2022 Share Posted March 3, 2022 Arch-Con Corporation web site story about this... https://www.arch-con.com/travis-midtown Quote Link to comment Share on other sites More sharing options...
j_cuevas713 Posted March 3, 2022 Share Posted March 3, 2022 20 hours ago, hindesky said: Way worse than we thought. Talk about value engineering. Architects - https://powersbrown.com GC - https://www.arch-con.com Ground breaking ceremony. Look at all those smiling faces excited for the same building they just demolished smh 1 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted April 21, 2022 Share Posted April 21, 2022 New plat for this. 2 Quote Link to comment Share on other sites More sharing options...
Paco Jones Posted April 22, 2022 Author Share Posted April 22, 2022 On 3/2/2022 at 8:56 PM, hindesky said: Way worse than we thought. Talk about value engineering. Architects - https://powersbrown.com GC - https://www.arch-con.com This is what Arch-Con does and is the primary reason they can secure the work they do. A public sector bid and construct mentality in a private, negotiated arena. I always get a feeling of discontentment when I hear a promising project has been awarded to Arch-Con as the builder. 1 1 Quote Link to comment Share on other sites More sharing options...
JBTX Posted April 25, 2022 Share Posted April 25, 2022 I thought they did a perfectly good job with Forth, but generally speaking, yes. I agree with you. Quote Link to comment Share on other sites More sharing options...
hindesky Posted April 30, 2022 Share Posted April 30, 2022 Variance Request sign. 3 Quote Link to comment Share on other sites More sharing options...
toxtethogrady Posted May 9, 2022 Share Posted May 9, 2022 On 3/2/2022 at 9:56 PM, hindesky said: Way worse than we thought. Talk about value engineering. Architects - https://powersbrown.com GC - https://www.arch-con.com Ground breaking ceremony. Well, there's no use half-doing it. Oh, wait... Quote Link to comment Share on other sites More sharing options...
wilcal Posted May 9, 2022 Share Posted May 9, 2022 That required visibility triangle goes through their stairwell right there. Also, this is on a primary Walkable Place street, so I think they have to provide some amenities that might not be picture. Will be interesting to see if the variance request is granted. 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted September 14, 2022 Share Posted September 14, 2022 JTB Demolition is at the site to demo the concrete foundation and parking area. 7 Quote Link to comment Share on other sites More sharing options...
hindesky Posted September 20, 2022 Share Posted September 20, 2022 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted September 21, 2022 Share Posted September 21, 2022 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted October 12, 2022 Share Posted October 12, 2022 5 Quote Link to comment Share on other sites More sharing options...
hindesky Posted October 25, 2022 Share Posted October 25, 2022 5 Quote Link to comment Share on other sites More sharing options...
hindesky Posted November 3, 2022 Share Posted November 3, 2022 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted November 11, 2022 Share Posted November 11, 2022 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted December 5, 2022 Share Posted December 5, 2022 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted January 20, 2023 Share Posted January 20, 2023 5 Quote Link to comment Share on other sites More sharing options...
hindesky Posted February 20, 2023 Share Posted February 20, 2023 4 Quote Link to comment Share on other sites More sharing options...
j_cuevas713 Posted February 20, 2023 Share Posted February 20, 2023 Anyone know what's going on on Holman? Looked like they were doing some work Quote Link to comment Share on other sites More sharing options...
004n063 Posted February 21, 2023 Share Posted February 21, 2023 1 hour ago, j_cuevas713 said: Anyone know what's going on on Holman? Looked like they were doing some work Isn't that part of the water line project that's currently ripping up Emerson St.? 1 Quote Link to comment Share on other sites More sharing options...