Jump to content

SkylineView

Full Member
  • Posts

    679
  • Joined

  • Last visited

  • Days Won

    48

Everything posted by SkylineView

  1. 2013 05 18: Weekly update. Sign now says 45% sold. They have been doing work on site between 11pm and 6am the last few nights. No one is pleased.
  2. It was clear this morning, and this sub-thread gets very little love.
  3. Not a great update, but you can see the crane (left side of the photo [it's low and just to the right of the first tower]). Bonus: You can see the Endeavor in Clear Lake to the left of the Mosaic (~30 miles away).
  4. 2013 05 04 Weekly update: Final update. Scaffolding is completely down. Bonus, the W.A. Parish power plant is visible to the left. ~20 miles away.
  5. Thread including links to all of the specifications. http://www.houstonarchitecture.com/haif/topic/27043-bus-lanes-down-post-oak/?hl=%2Bbus+%2Blanes It is a lot of money to spend on 4.4 miles, but it does include a complete tear up and re-build of the entirety of Post Oak, including acreage acquisition. The south end gets shifted significantly around Richmond. Additionally, it includes the tunnel (liberal use of that term) into the 610 median on the north side. I assume it also includes the transit center on the south side, with an access ramp to the 59 HOV/HOT. I've seen surveyors along the Blvd for the last few weeks. If the re-striping of Post Oak (a month ago and for reasons I cannot fathom) is any indication of the potential noise at 2am... yikes.
×
×
  • Create New...