-
Posts
9,432 -
Joined
-
Last visited
-
Days Won
948
Content Type
Profiles
Forums
Events
Posts posted by Urbannizer
-
-
-
- 6-Story Wood Type III Construction, Concrete Frame
- 269 Multi-family Apartment Units
- 667 - 1,505 Square Feet
- 368 Space Parking Garage
- Design Phase
- 5
-
Phase II is 5-stories with 117 units.
http://edi-international.com/default/Brochures/On%20the%20Boards.pdf
- 2
-
Larger rendering:
- 5
-
- Popular Post
Tadaaaa.
- 930,000 square feet
- 276 units/170 rooms w/ 20,000 square feet of retail
- 367,000 square feet office tower w/ 6,500 square feet of retail.
BBVA Compass Plaza/The Perennial/Gables Post Oak Mixed-Use Tower threads merged.
- 12
-
Meh. Hopefully this is not the final look. Looks thinner than the actual building and the previous renderings.
- 2
-
-
The website was registered 4-15-2014.
Hmmmm.
All private registration stuff is with a Canadian firm.
Hmmmm
Right, lots of Toronto imagery, and there are some Chicago images as well. Could be the same developer/architects who did those projects designed for Toronto?
There was another tower shown - the only one from the ground up - those other three were just place holders from what I gather - visuals? Could be wrong?
Luckily June 2nd is only a little ways off, so the wait for more information won't be too long.
And, the site has private registration in Toronto......
I noticed the Toronto high-rises as well, a lot of developments going on there that includes multiple high-rise condos. Could indeed be a Canadian firm.
-
Those renderings are for towers in Toronto.
-
Construction 2014.05.21 4275-7 by ThirdCoastRyan on Flickr
Construction 2014.05.21 4293-5 by ThirdCoastRyan on Flickr
Construction 2014.05.21 4299-301 by ThirdCoastRyan on Flickr
Construction 2014.05.21 4308-10 by ThirdCoastRyan on Flickr
Construction 2014.05.21 4317-9 by ThirdCoastRyan on Flickr
- 6
-
-
Construction 2014.05.12 3948-50 by ThirdCoastRyan on Flickr
Construction 2014.05.12 3984-6 by ThirdCoastRyan on Flickr
Construction 2014.05.12 3990-2 by ThirdCoastRyan on Flickr
Construction 2014.05.12 3924-6 by ThirdCoastRyan on Flickr
- 5
-
-
The latest change to the top:
Webcam: http://www.ridadev.com/page_hotel_marriott_marquis_houston.cfm#!prettyPhoto[hccmarriott]/2/
- 3
-
-
General manager Shannon Conway tells CultureMap that the construction "took all of our parking," which forced the decision to shutter. Frank Crappito plans to retire according to Conway, but the general manager may work with other employees at the restaurant to find a new space.
-
http://www.bisnow.com/commercial-real-estate/houston/1734-close-up-with-mike-wyatt/Mike's really excited about his next development, CORE Park West. He's wrapping up the master plan and putting a bow on the capital, and the team is working on construction drawings for the first building. That 320k SF spec facility (far right in this sneak-peek rendering) will break ground in September. Mike tells us the campus will be forward-looking, with all the elements companies want: A neat environment, efficient floorplates, lots of water features (if you're looking to cool off during the work day), fun places to walk (including adjacent Bear Creek Park), and great access/visibility.
- 3
-
-
-
The last two levels are within the crown; can't be used as office space. So 47 usable floors, 49 total.
- 2
-
-
-
Just came across this, probably not an actual proposal.
http://uli.org/wp-content/uploads/ULI-Documents/Berkeley-2028a.pdf
- 2
-
On Wednesday, UH signed a $25 million deal with the Texas Collegiate Regional Center for the construction of a new building at the Energy Research Park which will house laboratories and startup businesses for commercialized technology created by UH faculty.
- 3
Alexan Wilcrest: Multifamily At 935 N. Wilcrest Dr.
in Katy and Points West
Posted
http://www.ediarchitecture.com/Gallery/Gallery.asp?Mode=DirectoryDisplay&DirectoryUseAbsoluteOnSearch=True&id=597&category=On%20the%20Boards%20-%20Alexan%20Wilcrest