-
Posts
1,083 -
Joined
-
Last visited
-
Days Won
8
Content Type
Profiles
Forums
Events
Everything posted by tigereye
-
Found a daytime rendering I don't recall ever seeing before. Wonder this block has remained a surface lot after all these years? The site (parking lot behind 1 Shell) seems perfect for a tower or some form of development. Would be in the middle of the tunnel loop too.
-
Looks like a fresh render ...is this waterfall supposed to be added? Cause in the years I've been at 1KM, it's never done that. Edit: Went outside to look, don't see any plumbing unless it's way up there. This is the closest I can get as sidewalk is blocked for Trumpet Flower's installation. Edit 2 Coworkers say it was a waterfall and was recently turned off. Guess it was so insignificant, I never actually paid attention to it lol
-
EDIT: As for any tenants on 2 Main St spaces or 1 space in tunnel by escalators, no one knows anything yet.
-
Looks like it's go time for Renner's Trumpet Flower. Pieces are on site.
-
Hilcorp is moving in today. Tunnel connection open.
-
Took this earlier as I was riding by...
-
I-45 Rebuild (North Houston Highway Improvement Project)
tigereye replied to ToryGattis's topic in Traffic and Transportation
TXDOT looking at Purple City's plan, which would keep the Pierce Elevated in favor of MaxLanes & preserve interesting freeway architecture over Buffalo Bayou. http://houstonstrategies.blogspot.com/2016/03/a-compelling-alternative-to-i45.html?m=1 Don't like the Pierce Elevated Max Lanes idea & dressing up an overpass to be more street friendly as a way to knit together Midtown & Downtown. Meanwhile, the East End gets stuck with an above/grade & below grade freeway while Midtown gets a pretty overpass? Also I don't like preserving the overpasses over Buffalo Bayou. Posts on the previous page said it best - we need to find to better knit Downtown with Buffalo Bayou Park. A cable-stayed bridge or just a unified overhead lane structure with less column supports would do the trick. The idea of a new Western Gateway with an Allen Pkwy terminus roundabout is awesome. Also, there are some additional items for BRT & Bike lanes but IIRC, this would be a Metro & city issue that TXDOT would not address. Purple City plan http://purple.city/2016/03/10/a-better-plan-for-the-downtown-ring/- 3,356 replies
-
- 2
-
Murals going up. https://instagram.com/p/BDJM3x4OXTf/
-
Posted this on the other thread. Sakowitz is due to get an Artblocks install - the facial recognition display. art_blocks_mssq_artists.pdf
-
GreenStreet: Mixed-Use Development At 1201 Fannin St.
tigereye replied to MontroseNeighborhoodCafe's topic in Downtown
Sakowitz is earmarked to get an Main St Artblocks installation - the facial recognition display. The work may be related to this. art_blocks_mssq_artists.pdf -
Color Jam update: as feared, the road painted portions have not survived.
-
IMO city has done a good job with continued upkeep dating back to 2004 of the Main St planter boxes along center divider in the north end.
-
And on the north end, the planters are now filled.
-
Meanwhile on the south side, what completed portions of Main look like after renovation.
-
Last weeks repainting didn't fix the issue.
-
GreenStreet: Mixed-Use Development At 1201 Fannin St.
tigereye replied to MontroseNeighborhoodCafe's topic in Downtown
Dallas St update. New streetlights going up. -
All street level businesses were moved in January. There's work being done on the Dallas side.
-
That's 1000 Main.
-
Color Jam paint has extended to northbound red line tracks and sidewalks. https://twitter.com/thachadwick/status/706635103858855936
-
Center portion being painted red. Pic: https://twitter.com/thachadwick/status/706619660708368384
-
Some updates: 1. They're already closing down Color Jam to prime and repaint in the morning. 2. Renner's Trumpet Flower was due to go up starting today but is now delayed because of permitting. https://twitter.com/downtownhouston/status/705887134222168064 3. Redo of Main St Sq 900 Block of Main is almost done. Pic: https://twitter.com/thachadwick/status/705892995984326656
-
DTHTX is in process of reworking it. https://twitter.com/downtownhouston/status/704660186988818438
-
Installation begins next Friday, 3/4 https://twitter.com/downtownhouston/status/702252365718499329
-
Looks like Patrick Renner's Trumpet Flower could be next to go up. https://twitter.com/thachadwick/status/702214593431498753