Everything posted by Paco Jones

  1. They are. House & Robertson are the "Executive Architects".
  2. gin design group is handling the interior design (finishes, hardware, plumbing fixtures, light fixtures, and accessibility equipment) for these projects. Also, no restaurants are planed for 813 and 850 McKee (and nothing in the future that I am aware of).
  3. It does sound like it's going forward. I know that Block Companies has secured the primary sub-contractors...such as concrete, mechanical, plumbing, and electric. https://recovery.houstontx.gov/affordable-senior-community-on-memorial-drive-in-the-old-sixth-ward-to-be-rebuilt-with-disaster-recovery-funding/
  4. Project Name: The HUB Architect: Perkins & Will Location: Adjacent to the Science And Research Building 2 and up against The Cynthia Woods Mitchell Center for the Arts. Information: 2-story mass timber building that is 49,873 SF. Level 1 consists of Dining/Lounge, Restaurants, and a Coffee venue. Level 2 consists of offices, meeting rooms, multipurpose rooms, and an outdoor terrace (615 SF). There will be a significant amount of landscaping work as this includes the majority of Davinci's Grove.
  5. Project Name: LifeGift Phase III Expansion Address: 2510 Westbridge Street Houston, TX 77054 Owner: LifeGift Phase Corporation Architect: Ray+Hollington Architects, Inc. Information: 3-story office building addition for LifeGift with a footprint area of 7,800 SF. The expansion will be a total of 22,253 SF with a 2,297 SF roof terrace and a 2,900 SF vegetative green roof.
  6. Project: Warehouse District Address: 850 McKee Houston, TX 77002 Architect: W Partnership - Wallace • Wilson Architects Information: 4-Story multi-family with parking at level 1. Total residential space is 28,840 SF with 31 units. Outdoor amenity decks at level 2 and 4. 6 unit terraces at level 2 and 3 unit balconies at level 4. The building exterior is comprised of masonry and fiber cement siding. Project: Warehouse District Address: 813 McKee Houston, TX 77002 Architect: W Partnership - Wallace • Wilson Architects Information: 5-Story multi-family with parking at level 1. Total residential space is 244,314 SF with 273 units (all 1-bedroom). Outdoor amenity deck at level 2. Lobby and Coffee Room at level 1. 11,500 SF courtyard terrace and separate outdoor kitchen and fitness area (4,000 SF) at level 2. The building exterior is comprised of masonry and fiber cement siding with a small amount of metal panels. There will also be a total of 11 art walls at the North and West side of the building (20' high).
  7. Not sure what this means but it's being called "Fairview Collective" https://plattracker.houstontx.gov/edrc/DocDefaultReports.aspx?myAppId=67308&MyURL=xxx.houstontx.gov/2021/Applications/&myNumb=/2021-0850/SubdivisionPlatPDF_FAIRVIEW COLLECTIVE PLAT.pdf
  8. Pinto is not part of UT but it is owned by Ernest Cockrell, who is on the advisory board for UT Energy Institute. https://energy.utexas.edu/about/advisory-board/ernest-cockrell The article you linked is for 800 Middle St., which the Houston Housing Authority purchased form Pinto East End (Crockwell) in 2020 for around 15M. They had/have a deal in place with NRP Group to build what is called EADO 800. It looks like it will move forward. See bottom of page 4 (Item #15): https://houstontx.gov/citysec/agenda/2021/Apr0621.pdf Pinto East End (Crockwell) also owns the majority of the land West of Jenson Dr. up to the railroad tracks and Buffalo Bayou (south of 59). The majority of the land is in the works to be purchased by Houston Housing Authority for a development called Standard Jensen Phase I and II. https://houstontx.gov/housing/publiclegal/notices/2020/12/STANDARD_JENSEN_Contract-120820.pdf
  9. Project: Modera Waugh Address: 716 Waugh Drive Houston, TX 77019 Architect: EDI Information: 7-levels of parking with 10 levels of residential units above. Amenity deck and pool at level 8 and another amenity deck at roof. 392 units with SF of 412,431 (includes balconies). 174,736 SF of parking area with 575 parking spaces. Exterior is comprised mostly of masonry and cast stone with a small portion being stucco.
  10. Project: Alexan Junction Heights Address: 3003 Summer Street Houston, TX 77007 Developer: Trammel Crow Architect: EDI International Information: 7 levels of parking with 5 levels of residential wrapping garage. 335 units, total of approx. 520,000 SF Start Date: 12/20/2021 Completion Date: 4/19/2024 (I'm waiting for renderings)
  11. Project: Richmond Senior Village Address: 5615 Richmond Ave. Houston, TX 77057 Architect: Brownstone Architects and Planners Information: 5 level podium construction. Level one parking with Lounge, Business Center, and Activity Room. Level 2 has a pool terrace and also a "Quiet" courtyard terrace, along with a Fitness Center and Library/Lounge. Levels 2-5 contain residential units. Level 5 has 2 viewing decks. NUMBER OF UNITS = 124 GROSS SQUARE FOOTAGE = 171,083 SQ FT LEASING OFFICE = 2,460 SQ FT OPEN GARAGE = 37,171 SQ FT (104 PARKING SPACES) RESIDENTIAL= 107,148 SQ FT AMENITY = 2,304 SQ FT COURTYARDS = 9,803 SQ FT
  12. Project: 1550 on the Green Address: 1550 Lamar St. Houston, TX 77010 Architects: Bjarke Ingels Group (Design Consultant) Kendall/Heaton Associates (Architect of Record) Michael Hsu (Interior Architect) Information: Block 250 (aka 1550 on the Green) is located across discovery green in downtown Houston. The current design includes a 28 story cast-in-place concrete structure (level 13 is skipped) with curtainwall and metal panel facade. This project consists of a 2-level garage basement, parking on levels 3-8, office levels on levels 9-28 and terraces on levels 12,20 & 28. Total Garage Area: 214,337 SF Total Office & Terrace Area: 454,259 SF Start Date: June 15, 2021 Completion Date: November 29, 2023
  13. I believe the reason the developer and the General Contractor (Harvey) couldn't come to an agreement and the project being put on hold was because of the drawings. They are schematic at best and missing numerous details but they want to contract off of the set. Every contractor is going to add a considerable amount to their proposal just to cover themselves. Hopefully they are putting it on hold because a progressive set is being put together by the architect.
  14. All are 312 SF except the 3 ADA compliant units per floor, which are 382 SF, 473 SF, and 581 SF.
  15. Location Overview/Animation of Car Parking in Parking Vault https://vimeo.com/440164286/bc3089cf6e
  16. Project: Parking Vault Houston Address: 1441 Walker St. Houston, TX 77002 (Northern Corner of Walker and La Branch) Owner: Parking Vault, LTD. Architect: Gensler Project Information: 16-level 305,000 SF parking garage exclusively used for drop off and retrieval of vehicles by automated parking system. Parking Vault Video and Video Link: Pros of Automated Parking/Parking Vault Overview/Test Facility Demo https://vimeo.com/435206621/df76963be9 Location Overview/Animation of Car Parking in Parking Vault
  17. Project: Scott Street Crossing Architect: CIVE, Inc. Project Information: 5-story wood structure with concrete podium at Level 2. Level 1 will consist of parking, lobby, and a convenience store. Total of 240 student housing units. Exterior will be stucco. Enclosed courtyard at level 2 podium: 5,745 SF Building Area: 116,170 SF Parking Garage Area: 28,180 SF
  18. Project: Rice University New Engineering & Sciences Building (Abercrombie Laboratory) Architect: Skidmore, Owings & Merrill LLP Project Information: 5-level 243,030 SF engineering and science building. One level is below grade (basement) and levels 3 and 4 havea roof terraces.
×
×