-
Posts
296 -
Joined
-
Last visited
-
Days Won
13
Content Type
Profiles
Forums
Events
Posts posted by Paco Jones
-
-
6 minutes ago, toxtethogrady said:
Either that does not reflect the garage floors
You are correct, it does not reflect the garage. The garage and residential portions were designed separately for this project. Same core design team but separate design/construction documents (and also may have been permitted that way as well).
- 2
-
Honest, serious question...why do they care bout renters? Is there more to this story??
-
- Popular Post
- Popular Post
Project:
MD Anderson South Campus Research Building 5
Architect:
Elkus | Manfredi
7-story ( 8 including penthouse) and approx. 600,000 S.F.
- 17
- 4
-
- Popular Post
- Popular Post
Moving forward...
- 10
-
- Popular Post
City Centre 7 Parking Garage and Retail. Will be located North of City Centre 7 office building and the AC Hotel. 7,155 SF of retail space.
- 10
-
-
A mix of 3 and 4 story buildings, all surface parking.
Architect is Architecture Demarest.
- 3
-
Edit: I just noticed the bizjournal link posted above by @Urbannizer contains this rendering. My apologies.
- 7
-
I was just informed by someone who was bidding some construction scopes of work to Turner Construction for this that the project has suddenly been placed on hold. What an odd turn of events.
"We have been informed by the Owner that the project has been put on hold until further notice."
- 4
- 4
-
- Popular Post
- Popular Post
I spoke with a friend this morning who brought up this property. She said that some existing site utility issues at McAlpine St. were being finalized and that the multifamily development is now moving forward. The building design and total levels is not yet finalized but it will be a mid-rise with surface parking at Level 1 and a concrete podium above with residential levels stacked.
This is a Padua property and there are rumblings about Hines, to what extent I am not sure. I asked about Marquette Cos. and received shoulder shrugs.
Please consider all of the above the be "water cooler" talk. I do know that this development is moving forward, whether is goes beyond final design and pricing is uncertain. Or perhaps this is all posturing in an effort to push the land sale? This info should make things as clear as mud.
- 12
- 1
-
- Popular Post
- Popular Post
Project:
Memorial Park Running Complex - Cafe
Architect:
Schaum/Shieh
Information:
3,100 S.F. cafe/concessions building. Approx. 2,000 S.F. interior and 1,000 S.F. exterior covered patio area.
- 26
- 2
-
- Popular Post
Project Name:
Us Living W. Alabama
Architect:
Preston Partnership
Information:
13-story residential building. 9 Levels of residential over 4 Levels of parking. 385 units totaling 372,211 S.F. A total building area (garage not included) of 387,801 S.F. Garage has a total of 518 parking spaces. There is a 2,838 S.F. makerspace/art room with a 894 S.F. outdoor terrace at Level 3. Outdoor amenity terrace including pool, yoga lawn, zen garden, fire pit and grilling area totaling 16,634 S.F. at Level 5. Fitness, solarium, kitchen and dinning, bar/pub, and meeting spaces also at Level 5.
- 15
- 2
-
Project:
Araj Taghi Custom Homes Office Building
Address:
1514 Antoine Dr.
Houston, TX 77055
Architect:
Interfield
Information:
3-story office building. Level 3 will be Araj Taghi offices and Level 2 will be lease space. Ground level entrances and parking. 8,940 S.F.
- 7
-
- Popular Post
- Popular Post
Project:
Hotel Saint Augustine
Address:
4100 Loretto Drive
Houston, TX 77006
Architect:
Lake Flato
Information:
Building 1:
2-story, 15 rooms, total of 13,697 SF
Building 2:
2-story, 8 units, total of 6,413 SF
Building 3:
2-story, 24 units, total of 14,737 SF
Building 4:
2-story, 16 units, total of 9,738 SF
Building 5:
2-story, 8 units, event space, restaurant, and pool bar, total of 18,432 SF
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
SITE
- 20
- 3
-
15 minutes ago, strickn said:
Dominion Post Oak's classical villa penthouse was a far cry from 1661's. Thanks for the fine update. Do you think there might be any way to increase the colonnade's height (not necessary to increase the interior ceiling height) by 15' or so, masking more of the black box's vertical faces, so that it doesn't look undignifiedly short underneath the visual mass of the tophat?
That’s a fine idea and something I wouldn’t mind seeing as well.
I would be willing to bet that the mechanical penthouse, along with the level below, get changed for the better. This is the first real round of budgeting and design review, so I’m keeping my fingers crossed.
- 5
-
- Popular Post
Information:
35-story residential tower with 3 Levels of parking below grade. Total of 60 residential units totaling approximately 339,297 SF, with a building area of 471,384 SF (garage not included). Indoor pool and outdoor terrace deck located at Level 34. Golf simulator, sauna, fitness center, and billiards room located at Level 33.
- 18
- 1
-
Project:
East River Warehouse Offices
Architect:
Schaum/Shieh Architects
Information:
Two 2-story buildings located at the North side of the development.
Building A - 18,544 SF
Building B - 9,272 SF
- 4
- 2
-
- Popular Post
Project:
AC Hotel by Marriot
Address:
10655 Katy Freeway
Developer:
Midway
Architect:
DLR Group
Information:
The project is a new 135,035 S.F. AC Hotel by Marriott hotel located in CITYCENTRE . The project will consist of 10 stories; 1 level of public amenities and service functions, and 9 levels of guestrooms, consisting of 243 guestrooms. Guest parking will be accommodated in an adjacent parking structure separate of this project and property.
At the main entry on the ground level, the programmatic features include the registration desk, market, library, fitness, breakfast, AC lounge, and AC bar. Also at the ground level is the back of house service spaces, including front of house admin offices, kitchen, employee breakroom, housekeeping, and mechanical/electrical spaces. Each guestroom level will comprise of 27 guestrooms, elevator lobby, housekeeping room, electrical room, and the AC hydration station,Construction is tentatively scheduled to begin April 2023. Yes, the renders do only show it to be 9 levels, but at the moment the intent is 10 levels. Approximate building height is 125'.
- 24
- 1
-
This is affordable housing (HHA). 50% of the 350 units will be market rate, the rest affordable units. Waiting on building information...
Also, last I heard, Lovett was part of this deal as well.
- 7
-
At 800 Commerce St. they are going to demo much of the first floor and convert it to a parking garage. It's going to be a tight fit with the existing twelve columns spaced between each parking spot.
- 4
-
SOTO Night Club
- 6
- 1
- 2
-
3 minutes ago, JBTX said:
This is the building Abraham Watkins is in, yes? If so, yes. It floods frequently.
Yes, it is. This new addition to their building is theirs as well. It will connect to 800 Commerce at levels 2 and 3.
- 3
-
- Popular Post
- Popular Post
Going Up...
Project Name (take your pick):
Dorrington Lodging House
Dorrington Apartments
Dorrington Holcomb Hotel
Address:
2214 Dorrington Street
Owner:
New Horizons Hospitality
Architect:
Collaborate Architects
Information:
5-story hotel/apartments/Airbnb with on-grade parking at Level 1. There are 54 residential units and the building is approximately 40,000 SF. The units have a small kitchen and a stacked washer/dryer within the small closet, much like an extended-stay. The written description of this project when I received it was "Construction of a 5-story Airbnb. Kinda like a hotel but not."
- 14
- 1
-
Architect:
Page
Information:
7-story hospital with a total of 570,700 SF.
NOTE: The additional two buildings (MOB - Medical Office Building) that are shown in the last rendering are not included in this phase of construction.
- 5
Rosemary's Place At 3300 Caroline St.
in Going Up!
Posted
Okay, thank you. I didn't know if something happen to make them take this stance or if it was genuine.