- Popular Post
-
Posts
296 -
Joined
-
Last visited
-
Days Won
13
Content Type
Profiles
Forums
Events
Posts posted by Paco Jones
-
-
- Popular Post
1 hour ago, TheSirDingle said:The garage section is so much better than the previous design, also that white stone paired with the glass is going to make it pop. Personally I think the white stone is a much better choice than the beige counterpart, and the design for the upper deck pool is also very interesting. Overall it's a step up from the previous rendering.
The building is almost 85% composite metal panels. There is stucco at the balcony return walls, but everything else is metal panels. It does look good, though (imo).
47 minutes ago, jmitch94 said:I like it! I wonder if that top part is one epic penthouse with a massive outdoor area or and amenities area like a pool.
It is a community pool/amenity deck with a cafe and separate connecting outdoor deck. This is the best I could do for a visual.
Also, it does connect to the Hess garage.
- 22
-
- Popular Post
Rendering from this past March.
- 34
- 1
-
- Popular Post
- Popular Post
Earthwork is set to begin in October 2020.
- 15
-
- Popular Post
- Popular Post
Centennial Tower
This project consists of a new hospital tower within the Texas Medical Center, on the corner of John Freeman Blvd and Bertner Ave, next to Walter Tower.
The new hospital tower is a 29-story tower (511' to top of mechanical roof) with total square footage approximately at 1.2 million sf. The new hospital tower will adjoin to the existing Walter Tower on Levels 4 and below. Centennial Tower will also be connected to Walter Tower via a series of skybridges on Levels 9 - 21. Skybridge connectors will also connect Garage 7 and existing Walter Tower/Fondren Brown atrium to the Outpatient Care Center.
The site is located next to Walter Tower and will be bounded by Bertner Avenue and John Freeman Blvd. An existing building will be demolished on this site also owned by Houston Methodist.
- 24
- 1
-
- Popular Post
- Popular Post
1 hour ago, Luminare said:If that is still the timeline, then a reasonable assumption would be that they start digging in the next month or two.
The sub-grade has already been contracted out, so I would expect so. Ulrich Engineers is overseeing that phase.
- 15
-
9 hours ago, corbs315 said:
Love to know what the timeframe is on this now.
The schedule shows completion to be October 2022.
- 6
-
- Popular Post
Two Hermann Place (from December 2019).
- 21
-
- Popular Post
- Popular Post
17 levels (not including the mechanical penthouse) and approximately 217'. This is from January 2020.
- 16
-
- Popular Post
- Popular Post
HBU Morris Family Center for Law and Liberty to be located off Hinton Dr. at the parking lot next the University Academic Center.
- 13
- 1
-
- Popular Post
- Popular Post
UH College of Medicine.
- 15
-
- Popular Post
- Popular Post
Parcel 'C'.
- 20
- 1
-
- Popular Post
On 4/22/2020 at 12:29 PM, CREguy13 said:I walk by this garage almost every day and it looks like they are about wrapped up. Fingers crossed we see this existing equipment moved off site in the next day or two and immediately replaced with new equipment.
It is moving along very quickly. Expect groundbreaking soon.
- 17
-
- Popular Post
17 hours ago, KinkaidAlum said:Has anyone found the height for this one? I'm hoping it gets in the 500 foot range as a grand hotel lobby floor plus for-sale condos tend to have higher ceiling heights than rentals. The AIG tower needs a tall companion.
Not sure about the Pavilion, but the Hotel/Condos that will be going up next to it measures 478' 11" to top of level 37 Helipad.
- 11
-
- Popular Post
- Popular Post
On 5/2/2020 at 10:39 PM, wxman said:Is there an updated rendering for this project?
- 19
- 1
Hanover Autry Park: Mixed-Use At Allen Parkway & W. Dallas St.
in Going Up!
Posted
Hanover Square Block E is a 8 story mixed-use residential/retail mid-rise project located at Tirrell St. and Allen Parkway. The project consists of 421 luxury apartment units, approximately 10,500 SF of private amenity space, including a resort-style pool. The project wraps an 8 story precast parking garage and contains approximately 26,000 SF of street-level retail between the garage and lower levels of the tower.