Project:
RO Parcel 3
Architect:
House & Robertson (Exectutive)
Michael Hsu (Design)
Information:
Two 3-story mixed-use buildings with a pedestrian bridge connecting them at level 2 outdoor terraces. Combined, the buildings total 129,622 SF. Levels 1 and 2 will consist of restaurant and retail space while level 3 will be office space.
- 23
- 1
-
-
- Popular Post
- Popular Post
Architect:
GDA Architects
Information:
14-stories total. Levels 1-4 are parking and Levels 5-14 are residential (374,228 SF). 340 residential units with amenity/pool terrace on Level 5 and sky lounge at Level 14.
- 19
-
1 hour ago, mblue057 said:
@hindesky I heard word that the hold up was financial troubles, and they had to reconfigure the building to remove a floor from the initial plan. Estimated start date is now 9/23.
Fingers crossed (for personal reasons) that they run into more issues that further delay or cancel the project.
Not necessarily financial troubles, just over budget on each of the three proposed developments. There will be a short delay while redesigns are made to bring them back within acceptable budget range. Who knows, maybe one of the projects gets shelved to provide the additional cap needed to proceed with the others...
- 4
-
8 hours ago, Urbannizer said:
Does 33L mean it’s now 33 floors?
No, it's just an internal code for the city plan review.
- 3
-
- Popular Post
Address:
3120 Buffalo Speedway
Architect:
The Preston Partnership
Information:
Residential tower consisting of 28 levels above grade with one level of below grade basement. Parking is at basement and levels 1-5 and residential is levels 6-28. 317 units with a total of 378,387 SF of residential space. Ground floor retail space of 15,209 SF.
- 36
- 4
-
- Popular Post
- Popular Post
Parcel H
A 25-story Hotel and 18-story residential tower on top of a 4-story podium structure that includes a convention center and retail space. The roof terrace and pool deck is approximately 95,000 SF. The residential tower includes a rooftop pool deck that is +/-15,000 SF.
- 25
- 5
-
1 hour ago, mattyt36 said:
There's that mysterious "Dock High Pedestrian Path" again. I get the concept from walking around other parts of Sawyer Yards and MKT, but there isn't a loading dock anywhere there, at least as drawn, or I am blind. Does anyone know what it's supposed to be?
Typically, this is just an elevated/raised pedestrian walkway. The term "dock high" is likely referring to the actual height the walkway will be, which would be around 4'. These help corral and distribute the pedestrian traffic. In this instance I could be completely wrong, though.
For reference...
- 1
- 1
-
- Popular Post
Project:
Hanover Buffalo Bayou
Address:
707 Marston
Architect:
SCB (Solomon Cordwell Buenz)
Information:
A 317 unit residential tower consisting of 40 stories and two levels of basement parking. Pet Spa and outdoor Pet Run at Level 2. Outdoor amenity deck and swimming pool at Level 10. Project completion date of July 2025.
Building Break Down:
2 Levels of Basement Parking
Approximately 5,000 SF of ground level retail space
Parking at Levels 1-9
Residential at Levels 10-40
484,777 SF Building
241,227 SF Garage (554 spaces)
- 36
- 3
-
-
- Popular Post
Project:
Tanglewood Multifamily
Owner/Developer:
Palmetto Wynden LP (McNair Interests and Adelaide Real Estate)
Architect:
Kirksey
Information:
Mixed-Use project with office, multifamily residential, and structured parking podium components located on South Post Oak Lane at N. Wynden Rd. The building is a 17-story multifamily tower with an integrated shared podium garage structure (garage levels 1-4). The total gross building is approximately 439,500 square feet with 325,000 GSF of multifamily residential space (248 units) and a full complement of resident amenities. Also about 5,000 GSF of ground level commercial lease space.
https://i.imgur.com/oKaen8U.jpg
https://i.imgur.com/tW6D2tw.jpg
https://i.imgur.com/nGBeyzD.jpg
https://i.imgur.com/NAAl5B9.jpg
https://i.imgur.com/MtJM59O.jpg
https://i.imgur.com/gMBLGE3.jpg
https://i.imgur.com/eyH7yrU.jpg
https://i.imgur.com/IncNyWK.jpg
https://i.imgur.com/ApBlhXP.jpg
https://i.imgur.com/EeMhGIU.jpg
https://i.imgur.com/eTfqoli.jpg
- 18
-
A source informed me that, per BuildPro/Captiva, this development isn't happening (at least not by them).
- 1
-
Until the liens are taken care of I wouldn't expect any work to continue.
BTW, Google the owner of Highland Village...
- 1
-
- Popular Post
- Popular Post
Project:
Sully
Architect:
EDi
Information:
5-story residential wrap around 6-level parking garage. 303 units for a total of 288,087 SF (excludes garage).
- 14
-
- Popular Post
- Popular Post
Project:
Residences on Westheimer
Architect:
Ziegler Cooper
Information:
9 levels of residential over 4 levels of parking (1 level below grade). 209 units for a total of 359,551 SF of gross residential area. 2,800 SF of ground floor retail space. Construction will begin very soon.
- 29
- 1
-
- Popular Post
- Popular Post
Project:
The Langley
Architect:
EDi
Information:
134 units with a total SF of approx. 388,000 (excluding garage). Construction to begin in February with a 32-month duration.
- 25
- 1
-
Project:
Alta Sunset Heights
Architect:
EDi
Information:
5-story, 378 unit apartment building totaling 641,183 SF (excluding garage). Buildings wrap a 6-level parking garage.
- 9
-
- Popular Post
- Popular Post
The above picture is of Alliance Residential's Broadstone EADO garage portion of the project.
- 10
-
On 11/6/2022 at 11:12 AM, hindesky said:
https://www.aaaconstructor.com
I asked a worker and he pointed to his hat and shirt, it had that symbol on them. I think they are the concrete contractors and Jaxon Hill is the GC. The site superintendent mentioned they also built 1111 Studewood.
Thank you
-
Does anyone know who is building this project (the general contractor)?
-
- Popular Post
- Popular Post
The next two buildings that will be starting construction soon should round out Phase I.
Building D:
A 5-story office/retail building about 80,1470 square feet. It is planned to be 4 stories of office over one story of at-grade retail.
Building H:
This was originally planned as a 10-story office/retail building of about 300,000 square feet (9 stories of office over one story of at-grade office/retail). It is now a 5 level parking garage with 17,773 square feet of ground level retail. It will connect to the other parking garage that is being finished currently (Building G).
- 24
-
- Popular Post
PROJECT:
River Oaks Multifamily (assigned prelim name)
ADDRESS:
1414 Waugh
Houston, TX 77019
ARCHITECT:
Page
OWNER / DEVELOPER:
Camden Securities Company
INFORMATION:
34 floor residential high-rise tower containing 302 apartments with attached 6 level parking garage for 460 cars with amenity deck on roof. It will sit on the block bounded on the four sides by Waugh Drive, Bell Avenue, Rosine Street, and Pierce Avenue. The tower is approximately 594,826 gross square feet and the tower balconies are approximately 53,020 gross square feet. The parking garage is approximately 199,290 gross square feet. Residential floors will typically have private unit balconies on east and west elevations. Ground Floor areas will include the main lobby, building tenant services, office areas, fire command, security, mail room, maintenance, storage, loading dock, building fire and domestic water room, emergency generator, building electrical rooms, and drive through drop-off/delivery roadway. Tower level 6 is a tenant amenity floor containing fitness, recreation, socializing and workspaces for tenants. Contiguous with this floor level is the top of the parking garage where there will be 29,800 square feet of exterior tenant amenity spaces such as a lap pool, spa, lawn decks, paved decks, walking paths, fitness areas, and covered lounge areas. There is also a 2,063 square foot amenity deck at level 31 for social gatherings.
The staggered picture frames on the exterior of the building will be translucent glass with internal LED lighting while the perimeter of the building elevations will be porcelain paneling.I have no information on the other phases except that a mid-rise / tower will be north of this one, between Bell and Clay.
- 37
- 7
Bellaire Place: Mixed-Use Development At 5000 Fournace Pl.
in Going Up!
Posted