Jump to content

US 90A/OST from SH 288 to Spur 5 Reconstruction


Recommended Posts

51 minutes ago, samagon said:

so the same project they are currently doing on wayside north of the Gulf freeway.

be interesting to see if our traffic engineer mayor tries to butt his head into TXDoT projects?

The 5" sidewalks aren't being widened, so he's probably ok with it, but he might not like the full depth concrete pavement replacement. All he knows is "mill and overlay". 

Link to comment
Share on other sites

On 5/2/2024 at 11:48 AM, Triton said:

Thanks, I can't seem to find the link. Can you please share it?

From Griggs to Blythewood: https://ftp.txdot.gov/pub/txdot/get-involved/hou/us90a/041123-schematic-1.pdf

 

From Calhoun to MLK: https://ftp.txdot.gov/pub/txdot/get-involved/hou/us90a/041123-schematic-2.pdf

 

 

Edited by JLWM8609
  • Like 1
  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...