Jump to content

AREJAY

Full Member
  • Posts

    315
  • Joined

  • Last visited

  • Days Won

    4

Everything posted by AREJAY

  1. http://swamplot.com/scenes-from-the-set-of-hspvas-upcoming-downtown-campus-now-in-progress/2016-03-02/
  2. Well, can't argue with that, you've got a point there. I was assuming that the prospective buyer would be able to afford, and get financing, for either.
  3. Well, one positive would be living in something larger than 350 sqft. I assume you understand the difference between 350 sqft and 1200 sqft? Buy the townhouse and rent a room out to a buddy to more than cover the difference in mortgages.
  4. This one is now open and partially under lease http://www.bizjournals.com/houston/morning_call/2016/02/dallas-developer-opens-first-luxury-apartment.html
  5. Mods, is there anyway that the 17 pages of off-topic conversation could be moved into a separate off-topic thread? Although the arguments about PUF funds and college enrollments is enthralling, the one-page worth of actual development information and news is getting awfully hard to sort through.
  6. http://www.bizjournals.com/houston/morning_call/2016/02/first-look-inside-randall-davis-new-astoria-luxury.html Some first look interior shots.
  7. http://www.bizjournals.com/houston/morning_call/2016/02/exclusive-details-on-swanky-penthouses-condos-in.html
  8. http://www.bizjournals.com/houston/morning_call/2016/02/uh-turns-down-spot-on-ut-system-task-force-but.html So UH wants a say, but doesn't accept when an offer for a say is extended by UT?
  9. I believe the 24 floor count includes the 3 floor crown. At least, that is what the rendering reflects, 21 floors and 3 crown.
  10. http://www.bizjournals.com/houston/news/2016/02/02/houstons-first-micro-unit-condo-project-attracts.html
  11. Finally being demoed today From Westbury Houston facebook group Mods, can this be moved to going up? Also, the sign on the property states that only 30 lots remain, although this could be a sales tactic...
  12. http://www.bizjournals.com/houston/morning_call/2016/01/sneak-peek-inside-marvy-finger-s-second-downtown.html
  13. This view is going to have a lot more towers in it, in the next 2 years. And the all-important mid-action dump shot.
  14. Listing on Loop net has the availability of July 2016 and is still 0% leased. Is this one under construction, or is the listing out of date / too optimistic? http://www.loopnet.com/xNet/MainSite/Listing/Profile/Profile.aspx?LID=19149974&SRID=6779655516&StepID=101
  15. Thanks, i was actually editing the post as you were posting.
×
×
  • Create New...