Bad news. Broadstone EaDo will not be moving forward. Possibly in the future, but there are no plans as of right now.
- 162 replies
-
- 9
-
- alliance residential
- broadstone
-
(and 3 more)
Tagged with:
-
Drewery Place: Multifamily High-Rise At 2850 Fannin St.
Paco Jones replied to Urbannizer's topic in Midtown
Right now, the start date is set for April 2021. I do not anticipate this being postponed. *Edit: Foundation to Grade Permit – April 2021 Structural Frame Permit – July 2021 Building Permit – September 2021 The building will have individual permits for each floor.- 1,569 replies
-
- 17
-
- the preston partnership
- ziegler cooper
- (and 6 more)
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
Paco Jones replied to largeTEXAS's topic in Downtown
As of right now it is being called Discovery Tower.- 1,224 replies
-
- 10
-
- multifamily
- ziegler cooper
- (and 4 more)
-
M Square: Mixed-Use Development At 3200 Post Oak Blvd.
Paco Jones replied to editor's topic in Going Up!
Storm water retention. Lately it is becoming more common to build a cast-in-place concrete detention vault below buildings. Knight Road (Barvin) and Bowen are examples. Block 98 was originally designed with one but later eliminated. The ones in the picture are pre-cast. They are sealed together and buried after the storm lines are tied in.- 624 replies
-
- 15
-
The amenity deck at level 10 The pool shell View of the mid-rise foundation work
- 155 replies
-
- 16
-
- river oaks
- multifamily
-
(and 5 more)
Tagged with:
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
Paco Jones replied to largeTEXAS's topic in Downtown
I don't know the answer to your question, but soil boring goes from 100' down to 150'. Even at 150' there is still just reddish-brown clay. This is from a geotechnical report that was done for a project inside the loop.- 1,224 replies
-
- 6
-
- multifamily
- ziegler cooper
- (and 4 more)
-
Founders District/The Cannon Mixed-Use At Beltway 8 & I-10
Paco Jones replied to Urbannizer's topic in Going Up!
Powder Keg- 61 replies
-
- 9
-
- work america capital
- mixed-use
-
(and 2 more)
Tagged with:
-
This one will start in November. No major design changes. 7 story, 33 unit condominium with 2 levels of parking. Amenity deck and pool at level 2.
- 109 replies
-
- 14
-
- upper kirby
- pelican builders
-
(and 3 more)
Tagged with:
-
Updated renderings. "The University of Houston – Downtown (UHD) has boldly envisioned a new hub for student wellness and success in support for its diverse and growing student population. The university has chosen a dynamic property that proudly announces to the city of Houston the importance of this facility, the critical services within and the community that it will build for UHD students. This facility will drive health/wellness, greater student success and will serve as the heartbeat of the campus in the future."
- 628 replies
-
- 21
-
Drewery Place: Multifamily High-Rise At 2850 Fannin St.
Paco Jones replied to Urbannizer's topic in Midtown
This hotel/condo will take up half the block. The Fannin side of the block is referenced as being for the "future tower" (based on what I have seen). I don't have any info on that or the other planed mid/hi-rises.- 1,569 replies
-
- 6
-
- the preston partnership
- ziegler cooper
- (and 6 more)
-
Drewery Place: Multifamily High-Rise At 2850 Fannin St.
Paco Jones replied to Urbannizer's topic in Midtown
All of the above. Restaurant/bar, co-working space, and small retail are on level 1.The only other notable space at level 1 is the hotel lounge (approx. 1,900 SF). No, I've heard nothing. If I had to guess then probably 4-8 months, assuming no issues. Foundation should be going out for permit soon, if it has not already. Something like this will usually take about (2) years to complete. Just my opinion. Also, please excuse me if I come across dry in my posts. I am just not able to articulate myself in written word the way I can when speaking to someone face-to-face.- 1,569 replies
-
- 18
-
- the preston partnership
- ziegler cooper
- (and 6 more)
-
Per a VP at GT Leach... "Still early on 3723… The Paramount. It’s currently still in the marketing phase. It currently has zero (0) sales, so it might be a while."
- 161 replies
-
- 8
-
- powers brown architecture
- condominiums
-
(and 2 more)
Tagged with:
-
Drewery Place: Multifamily High-Rise At 2850 Fannin St.
Paco Jones replied to Urbannizer's topic in Midtown
Project: Tower A (Hotel and Condos) Address: 2701 Main Street Houston, TX 77002 Architect: Preston Partnership Information: A 32-story hotel/condo with exterior amenities at levels 9 and 32. Hotel restaurant/bar (3,200 SF), co-working area with conference room (1,200 SF), and 1,165 SF of retail at level 1 Parking at levels 2 - 6 Ballrooms at level 7 Fitness at level 8 Outdoor dining, dog run, and yoga at level 9 along with two swimming pools Outdoor garden area and pool at level 32 183 hotel units (level 10 - level 18) 191 condo units (level 9 and level 19 thru level 32) 558,000 total square foot Future tower at Fannin side.- 1,569 replies
-
- 37
-
- the preston partnership
- ziegler cooper
- (and 6 more)
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
Paco Jones replied to largeTEXAS's topic in Downtown
It is Andres Construction. @hindesky posted it a few replies up- 1,224 replies
-
- 2
-
- multifamily
- ziegler cooper
- (and 4 more)
-
Project: U of H Partnership Building Architect: HarrisonKornberg Architects Address: 3002 Leek St. Houston, TX. 77004 Information: A one-story 5,700 SF building for university outreach to the community that includes a multipurpose room, seminar room, and office spaces.
- 1,708 replies
-
- 14
-
- alfred c. finn
- shepley bulfinch
- (and 8 more)
-
Houston Endowment Corporate Headquarters At 3683 Willia St.
Paco Jones replied to Urbannizer's topic in Going Up!
Updated renderings. Construction is now set to begin mid-November.- 256 replies
-
- 20
-
- kevin daly architects
- kirksey architecture
- (and 3 more)
-
Sunnyside Health And Multi-Service Center At 4410 Reed Rd.
Paco Jones posted a topic in Points South
Project: Sunnyside Health and Multi-Service Center Location: 4410 Reed Road Houston, TX 77051 Architect: Kirksey Information: The Sunnyside Multi-Service & Health Center is a single 2-story building, approximately 56,000 SF. The new facility will combine the community service oriented Multi-Service Center programs and the Health Center programs into one facility. The building will be located on a 6.5 acre site and construction is set to begin the 2nd quarter of 2021 with a duration of approximately 16 months. -
7-Story Multifamily Mid-Rise At 3360 McCue Rd.
Paco Jones replied to Urbannizer's topic in Going Up!
Bristol Cove- 74 replies
-
- 3
-
7-Story Multifamily Mid-Rise At 3360 McCue Rd.
Paco Jones replied to Urbannizer's topic in Going Up!
Per Matt Brendel (Senior Managing Director of Legacy's Texas office): "Sorry to announce this is a dead deal."- 74 replies
-
- 7
-
NAME: Asian City Plaza ADDRESS: 6865 West Sam Houston Parkway South Houston, TX 77072 OWNER/DEVELOPER: Asian City Development, Inc. 6833 W. Sam Houston Parkway South # 202 Houston, Texas 77072 ARCHITECT: WCA Architect (Sole-Practitioner Architect) INFORMATION: 6-story free standing 157,437 sq ft building. The project includes 1 level of Retail Space, 3 levels of Parking Garage, and 2 levels of Office Space. Level 1 Retail: 21,210 SF Levels 2-4 Parking: 80,690 SF Levels 5 & 6 Office: 56,535 SF https://www.emporis.com/complex/143480/asia-city-plaza-houston-tx-usa No information on the listed 33-story from the above link.
- 31 replies
-
- 7
-
- asian city development
- mixed-use
-
(and 3 more)
Tagged with:
-
Prose Memorial: Multifamily At 1128 Silber Rd.
Paco Jones replied to Highrise Tower's topic in Katy and Points West
- 16 replies
-
- 6
-
- memorial
- spring branch
- (and 4 more)
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
Paco Jones replied to largeTEXAS's topic in Downtown
There will be a level 3 connection through Hess garage by the pedestrian sky bridge that connects to Hess tower. The building itself won't have direct connection to the tunnel system.- 1,224 replies
-
- 16
-
- multifamily
- ziegler cooper
- (and 4 more)
-
Lennar will begin construction soon on the wood framed 5 story mid-rise that connects to the South face of the garage.
- 155 replies
-
- 13
-
- river oaks
- multifamily
-
(and 5 more)
Tagged with:
-
Parc Binz I & II: Offices With Retail At Binz And Chenevert St.
Paco Jones replied to ChannelTwoNews's topic in Going Up!
This one has been put back out for updated pricing. Design changes have been made to lower construction costs (for example, the terrace at level 2 has been deleted). Still includes underground parking (15,000 SF).- 164 replies
-
- 13
-
- museum district
- retail
- (and 3 more)