SkylineView
-
Posts
679 -
Joined
-
Last visited
-
Days Won
48
Content Type
Profiles
Forums
Events
Posts posted by SkylineView
-
-
2013 10 12:
- 7
-
2013 10 12: Have done the outside, now working left to right (east to west) across the site.
- 3
-
2013 10 12: Photos from this week... and this morning.
- 4
-
2929 was waaaaay late in kicking off. Remember the old "coming in mid 2013" sign?
-
They started at 7:01 on the nose... I love the sound of a nice excavator in the morning.
- 4
-
-
-
-
-
-
At least one of the tower crane's jumped over the weekend.
-
New fence around the site, dumpster out front.
- 1
-
2013 09 22: With no wind, the dust is hanging around.
- 5
-
2013 09 22: Weekly update.
- 4
-
2013 09 22: Weekly update
- 3
-
Thanks for the graphic Mike.
-
-
-
2013 09 14:
- 3
-
Not visible in the photos above, but as Clutch noted, serious effort on the garage is ongoing.
-
2013 09 07:
Creating another new parking lot nearby.
- 5
-
2013 09 07:
- 5
-
Can't do an underpass on Westheimer due to the flood control stuff (which they have been working to box and cover for the last year). Could do an overpass, though would wreck the feel of Highland village. As an example of the up & down distance required, check out this study for the 1960 rail over/under pass up north (just east of 249)... specifically Exhibits A and E.
It's a good question though... maybe easier on Richmond? it looks like there is extra ROW on the east side of the tracks.
http://www.txdot.gov/inside-txdot/projects/studies/houston/fm1960-bnsf-exhibits.html
-
First floor being poured (visible behind the base of the middle crane).
- 3
Harlow River Oaks: Multifamily At 70 E. Briar Hollow Ln.
in River Oaks/Upper Kirby/Greenway Plaza/Bissonnet
Posted
2013 10 12: