Jay123
Full Member-
Posts
18 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Everything posted by Jay123
-
I am talking about the metrorapid system.The university line should've been the first one built before the silver line.It was going to be light rail but politics and money changed the plans.
- 258 replies
-
- midtown
- metro line
-
(and 5 more)
Tagged with:
-
The university line should’ve been built first and then the rest of the lines added after since it was supposed to be the backbone of the metrorapid system.
- 258 replies
-
- 1
-
- midtown
- metro line
-
(and 5 more)
Tagged with:
-
https://abc13.com/amp/houston-light-rail-how-to-get-hobby-airport-metro-transportation-harris-county-authority/14054604/ Hopefully this project gets started sooner than later.
- 258 replies
-
- midtown
- metro line
-
(and 5 more)
Tagged with:
-
Contract Awarded for 160 Clean Diesel Buses for METRO Fleet
Jay123 replied to ChannelTwoNews's topic in Transit
Whatever happened to the electric buses we where going to get? Have they been delivered or are they testing them? -
And is the metrorail going to be extended to shepherd park and ride?I haven’t seen metro lately say anything about that and the extensions to hobby airport.
-
Didn’t amtrak get several billions of the infrastructure law?They could use that money and revive the SA to Austin rail project too.Texas needs regional rail.
-
Considering greyhound lease is up next year and might need a bigger structure than the current one.
-
Metro will expand its current park and ride in missouri city by sh6 and hopefully open by 2025. https://content.govdelivery.com/accounts/TXMETRO/bulletins/368e2ec
-
Also why doesn’t metro make a brt route on bellaire and I remember when the metro next plan was approved a “signature” service for westheimer was approved but now they have reduced it to a “boost” corridor.
-
Hi I would like to start a thread with the new brt extension to gulfton soon. https://www.ridemetro.org/about/metronext/metrorapid/metrorapid-gulfton-corridor-project
-
Spur 5 Extension- Future Highway 35 To Alvin
Jay123 replied to illusionescape's topic in Traffic and Transportation
https://www.houstonchronicle.com/news/houston-texas/transportation/article/griggs-long-mykawa-rail-overpass-metro-18254783.php#photo-24074222 -
Westheimer should at least get a quickline.I've taken the 82 from downtown to the beltway it easily takes up more than an hour.Metro had mentioned a signature bus for the westheimer, but ended up with a boost corridor.But only for part of the route.
- 202 replies
-
- brt
- metrorapid
-
(and 2 more)
Tagged with:
-
I-45 Rebuild (North Houston Highway Improvement Project)
Jay123 replied to ToryGattis's topic in Traffic and Transportation
Is txdot and metro also adding a brt bus lane to the north freeway?- 3,356 replies
-
What metro needs to do is make the metro rail and bus more secure.Ive been harrased by panhandlers for money and they wreak of urine and beer.Hopefully metro takes serious measures after these serious incidents these past months.
-
Any update on behalf of metro on the westheimer signature bus metro boost corridor?
-
Would metro have any interest in restarting the project to start a new pr service to pearland after several futile attempts the last decade?