Jump to content

thatguysly

Full Member
  • Posts

    626
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by thatguysly

  1. It makes sense to start the base. The previous articles mentioned that they were close to signing a couple tenants that would need to move in 2020 or 2021. Those dates are already aggressive for a structure this size but getting started would at least pose them to get it built quicker once the land the tenants.

  2. 26 minutes ago, Nate99 said:

    I like it, such a huge new development.  It would be very interesting to see what would become of the area immediately adjacent, north of Clinton drive and then on to the northeast into the fifth ward proper.

     

     

     

    The hard part is what happens to the residents if they get pushed. This area works because its an empty industrial site. Development slows if you don't have low income housing mixed in if you go into the fifth ward. You can see that slow downs with that type of expansion in areas like the second, third, and fourth wards, and near northside. There are areas that have historical designations and low income housing requirements. My hope is projects like this one bring in construction and service industries jobs that can be filled with the surrounding population and help lift everyone.

  3. On 6/7/2018 at 6:42 PM, mattyt36 said:

    Welcome to the neighborhood, I’m right by Bethel Park

     

    Awesome. I am close to West Webster Park.

     

    In an update, they were delivering a flatbed of drywall this weekend. There were more workers on site as well. Not a full crew but at least 20 instead of the normal 5 or so.

  4. It did what it was designed to do. I am glad there are parks and trails in the flood area so it looks nice the vast majority of the time it isn't flooded. The bayou could be a overgrown, trashy wasteland it once was that floods or it could be great parks, trails, and dog parks that are highly enjoyable that also flood.

×
×
  • Create New...