  1. sorry for the (laptop power greens). It was supposed to say flat top tower crane but I am hoping you guys caught that. Like I said I'm sorry I'm using talk to text and sometime this speaker Hears whatever it wants to hear I guess. I know for sure that 2 flat top tower cranes are going to go all the way up with the building but I'm not sure about the Luffing tower crane because I know it is supposed to start on the garage but I don't know if they have decided to let it also go up all the way with the building they want 54 floors of concrete done in 18 months. I know originally it was supposed to be 3 Flat top tower cranes but either the one that was supposed to start the garage was going to be in the way of another building when it is put into weathervane or is the garage was going to be slower in progress than the tower and the tower would get in the way off the other tower crane when it is put into weathervane so they went ahead and got a different Crane. but we will know soon guys. In the next 2 to 3 months I believe all of the Cranes will be up.I hear the first one is going up in August with the poor of the foundationbecause that is when they are going to set the base section of the tower crane or Cranes
  2. Wel l at first it was changing because they just didn't know for sure how many they wanted to put and the exactcalculation for the Ground to be able to support. but I think the last changes were because of them not knowing exactly how much space they were going to be able to use with that slanted roof for the amenities that they want to put up there plus the penthouse with The cooling towers and elevator shafts. so there has been a lot of little detailed stuff that has made the floor plan change quite a bit but from my understanding now is MarkEd at 54 total. now I am NOT 100 percent sure because I forgot the exact number but I know that one of the two laptop power green is going to be either 880' 860' at Top out.so is the tallest one in the 880 then the next one would be 840 and then the building would be about 805 or anywhere between 800 to 815 in building height. Nowif the tall is crane is 860 then the next one would be 820 and that would be cutting it real close for this building to be 800 foot because they usually like it to have 30 to 40 feet of space between the Jib and the building.but if it doesn't hit exactly 800 it will be within 20 feet of it
  3. Just to let you guys know the building will be two floors under ground level.all together there will be 52 concrete floors and then remaining two will be iron which will be the amenities so I total of 54 floors all together. And yes the ground will have space in it vroom the penthouse with AC unit and cooling towers. There will be 3 cranes on the job 2 of them will be flat top tower crane the third one will be a Luffer tower.originally they were all going to be flat top but they needed the lover because it wouldn't be able to weather vane and swing around with the wind without getting in the way other building before they jumped the grains up high enough. From what I understand in what I hear the building structures is scheduled to be completed 18 months after the foundation is Poured around August or September.hope you guys have a good one enjoy the info
  4. yep and they are almost done with the third 12 story and after that one is complete then they will start with the 4th one and the second a park or 8th floor parking garage. They also have more plans in the works for up to 8 of those 12 story building because they own all the property up the dairy Ashford and all the trees in between the daycare and the campus
  5. Wel more than a rumor for tower 3.Its put on paper and waiting for some signatures. And no its not shell because they are in the same process For they are next 4 12 story buildings. They are done with 1 & 2 fixing to be finished with the structure on 3,4 is already signed and under contractand now that work in the deals for the rEst. they are also proposing turning the two 6 storey building that were made in phase 2 into two 12 story buildings by moving everyone from nose to the building E which is the second 12 into taking the roof off the six story in adding six floors more to both of them
  6. Sorry for the typos I am using my talk to text. Of course that was supposed to say shell isn't going anywhere but Woodcreek
  7. cheryl is staying at Woodcreek and expanding they're on their third building and have already signed off on the 4thwith four more in the works and also where existing face to project of the 2 6 storey are supposed to get the Roofs taking off and 6 more floors to them. plus they own all of the property on the other side of dairy Ashford and just built a daycare center there and are in the process of building their second 8th floor parking garage while getting ready 2 Tear down all of the trees that are in between their existing buildings and the daycare center which is another 3 acres. So the word is about a 12 story altogether
  8. I'm pretty sure shell not going to The Woodlands building that big of a tower. I have some good inside sources that thing they are already on their 3rd 12 story off of dairy Ashford at Woodcreek and already have a 4th one sign to build after it and are having talk about actually ending up with seven or eight of the 12 story because they own the property on the other side of dairy Ashford where they just built a daycare and there's at least three aces over there. And I have also her that Anadarko is actually building a third tower even though they finshed the 2nd i believe in august
×
×