sorry for the (laptop power greens). It was supposed to say flat top tower crane but I am hoping you guys caught that. Like I said I'm sorry I'm using talk to text and sometime this speaker Hears whatever it wants to hear I guess. I know for sure that 2 flat top tower cranes are going to go all the way up with the building but I'm not sure about the Luffing tower crane because I know it is supposed to start on the garage but I don't know if they have decided to let it also go up all the way with the building they want 54 floors of concrete done in 18 months. I know originally it was supposed to be 3 Flat top tower cranes but either the one that was supposed to start the garage was going to be in the way of another building when it is put into weathervane or is the garage was going to be slower in progress than the tower and the tower would get in the way off the other tower crane when it is put into weathervane so they went ahead and got a different Crane. but we will know soon guys. In the next 2 to 3 months I believe all of the Cranes will be up.I hear the first one is going up in August with the poor of the foundationbecause that is when they are going to set the base section of the tower crane or Cranes