Jump to content

Ongoing Improvements With Jones Stadium


mrfootball

Recommended Posts

F182923.jpg

Jones SBC has been re-branded 'Jones AT&T Stadium'

F182927.jpg

Preparations and re-grading of field complete along with new brick masonry field wall surrounding the field that matches the 'Tech' brick found throughout campus.

F182924.jpg

New Field Turf to be laid down this week

front.jpg

In November, construction will begin on expanding the East side of the stadium to match the West Side (above) building. Included will be new luxury suites, a parking garage and additional seating for 10,000 fans.

Edited by mrfootball
Link to comment
Share on other sites

Wow! That brick wall looks AWESOME!! 100% improvement. I can't wait to be there this year!

On second inspection of the second set of pictures, it looks like the athletics building (building behind the student section in the middle photo) had a bit of a makeover too.

Edited by brijonmang
Link to comment
Share on other sites

  • The title was changed to Ongoing Improvements With Jones Stadium

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...