All trains shut down downtown for construction today


editor

Recommended Posts

I went for a little walk this morning, and found that all three MetroRail lines downtown are closed for construction.

They're digging up the tracks connecting the southbound Red Line to the eastbound Green/Purple Line

E2B5370A-86F8-4467-A6E5-22245F4CAAB7.jpg9B429B3C-99F0-493A-BAAB-04BB29DD74BA.jpg

53740274-C2C1-4068-AA54-00F6BE497D6C.jpg

CFCC0150-0C89-40A0-B822-FC63F8A5EE21.jpg

They're also fixing the bricks at westbound Green/Purple/Red frog

5E3A2116-2D12-4858-96CB-665946CCDC02.jpg

E7E44039-5CB3-43FC-8BE7-988E32DDCD50.jpg

And they're actually finishing the east end of the Central Station Capitol platform, which has been unfinished for at least two years.

CEEDC76D-9C88-4C8E-9ABB-A273D0229C07.jpg

There maybe other work happening, as there's lot of trucks parked on tracks around the area.

B5EC204B-0238-4C17-9C99-29BCF86A9533.jpg

 

  • Like 8
Link to comment
Share on other sites

4 hours ago, editor said:

A shot from today.  Metro's web site says this should be over by Monday morning.

A0501F0B-9C60-416D-833C-6AAFD527470A_1_105_c.jpg

Thanks for all the updates!

On Friday, I was unable to take the Redline back home and I noticed your thread.  Here's the photos I took of the construction by Central Station Main.

You should have stopped by 601 Travis and said hi.  We'll get together soon.

UzuPNKi.jpg

DjpEaxV.jpg

 

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...