Jump to content

Geoff8201

Full Member
  • Posts

    406
  • Joined

  • Last visited

  • Days Won

    2

Posts posted by Geoff8201

  1. When you drive by this thing, with how close it is to the street corner it looks huge, and it's only 5 floors high... 35 to go!

     

    And I'll get some shots soon from a completely different angle atop another nearby building, where you can really see it impact the skyline (not the AT&T building unfortunately, haha)

     

    OK, now that I promised I'd do this, hopefully that'll lock me in to actually getting it done!

    • Like 5
  2. This one gives me mixed feelings...

    On one hand you have a new 20 story property... would be nicer if it were 30 stories... if you're going to build it make it stand out. Hopefully it will in the architecture.

    But then on the other... this is a nice little green space that would be lost. What is the driving factor to warrent the need for another hotel in this area?

    • Like 1
  3. I count 40 floors on that rendering. 40>35!

    Good eye, you called it months before any of us knew the floor count was going to increase! Never dismiss subtle clues!

    I can't recall ever seeing a project such as this make the FRONT PAGE of the newspaper before. Maybe I'm not going back or thinking hard enough, but now everyone knows it's coming.

    And I think Blanco's is ON the Taub site. It's likely if this site gets developed, Blancos would go away, which would be sad. It's a side note to this thread, but I'm curious, what exactly is Hines planning?

  4. When a sign says ''coming,'' does that mean it will be finished by Summer 2014 or does it mean construction starts Summer 2014?

    This has been debated on this very same thread. No one is clear on an exact definition thus far.

    To me, "coming" means the same as groundbreaking in the case of buildings... but thats just what I understand it to mean.

    Summer of 2014, assuming June, gives them 21 months, on an already clear site to dig a big hole, erect a crane, and start coming out of the ground. Once they get to the more typical floorplan these things usually rise at about a floor a week, keeping in mind the first several levels if retail, parking garage and mecanical areas will not be typical and rise much slower. It's not impossible, but would be a very fast build, and theres no way the interior would be finished and move in ready... this is why I see it being more feasible that we will see the starts of a crane in summer of 2014 rather than an entire building. If they plan on topping off the structure in 2014 then they need to get building...like right now.

  5. Sadly, the Dome was built to be used as a sports stadium, That's its design and only practical use, if that use cannot be fulfilled, then it needs to be torn down.. which in itself isn't cheap either... but I think inevitable.

    And once that happens then it wont be what the dome should be used for anymore, then it will be what will that plot be used for. Hopefully not to sit like the astroworld plot has.

  6. If it says Coming 2013, that's the projected date for the building to be completely finished.

    "Coming 2013" seems unrealistic for a 35 story building to be completely finished when as of now there is still an untouched plot. I believe Coming 2013 simply means this is when it will start, not when it will finish. 2727 Kirby as a comparison took over a year and a half from foundation to top off and almost another year for a finished exterior. That was 30 floors, this one is 35. I'd expect to see goings on picking up as this year goes on, and the beginnings of a foundation late this year at the earliest.

    • Like 1
  7. Cool video, but it's copyright 2011, and since hasn't the condo tower idea been scrapped?

    Although I'm sure there are those who believe a residential high rise right within walking distace of everything would be a great addition and they wouldn't be wrong. For this reason I don't fully believe that idea is dead.

×
×
  • Create New...