-
Posts
21,552 -
Joined
-
Last visited
-
Days Won
1,434
Content Type
Profiles
Forums
Events
Posts posted by hindesky
-
-
Now Leasing.
- 9
-
26 minutes ago, cloud713 said:
That picture makes the BIGGIOS sign look like it's on the northwest corner/facing west, above the pool deck? I was thinking the bar/restaurant would be more towards the southeast corner, by the GRB.
It's on the southeast corner.
- 2
-
- Popular Post
BI G S
- 21
-
- Popular Post
- Popular Post
- 11
-
- Popular Post
- 11
-
- Popular Post
- Popular Post
- 11
-
-
- Popular Post
- Popular Post
- 18
-
Houston Business Journal has an article about the property today but I'm not a paid subscriber so I couldn't read it.
http://www.bizjournals.com/houston/news/2016/11/15/houston-luxury-homebuilder-still-bullish-on.html
-
Clams Casino, one of the artists I'm anxious to see at Day for Night.
-
phillip_white's drone video makes the park look further along than from the ground level.
-
- Popular Post
- Popular Post
Monarch: They looked like in the ground lights embedded in the sidewalk.
According to a worker this is a water fountain feature.
- 16
-
On 11/13/2016 at 4:54 PM, htownboy said:
Time for the twisty tower?
There is room just to the west of this project.
- 3
-
- Popular Post
- Popular Post
Come around the corner and see all these trucks and a AT crane with it's boom laid down on the street. I'm thinking this seems kind of late to get started to take down the last sections of the tower crane. Turns out TNT had major mechanical problems with their crane they were going to use to remove the remaining portions of the tower crane. They couldn't get the wings to move into position and without them it would be impossible to get the tower crane down. Their mechanic attempted to repair it all day Saturday but couldn't get it to work. They were taking apart the crane when I happened by. Policeman providing traffic control said the TNT boss was not in a good mood. TNT will have to eat this this job and try to reschedule a street closure to finish the job. Hopefully Hines, Harvey and TNT have enough clout to get a street closure permit from the city soon but with Thanksgiving parades coming soon I don't see it happening till early December unless they can get a permit for next weekend.
- 16
-
-
- Popular Post
- Popular Post
- 11
-
- Popular Post
- Popular Post
- 10
-
- Popular Post
- Popular Post
- 17
-
I'm trying to guess which tower crane will be next to come down after 1825 and 609 (postponed removal), my guess is Alessandra before Aris or Catalyst.
- 8
-
Western side.
South side.
- 7
-
- Popular Post
- Popular Post
They only needed 1 day to take the tower crane down.
Southern side. Hopefully they do something to make that parking garage entrance better looking.
Eastern side.
- 14
-
-
- Popular Post
- Popular Post
Waterproofing the lower deck pool area.
- 15
-
- Popular Post
- Popular Post
Demo is moving right along, hopefully construction is right behind it.
- 13
Mid Main: Mixed-Use Development For Midtown
in Midtown
Posted
http://www.livemidmain.com/