Jump to content

cityliving

NP
  • Posts

    1,354
  • Joined

  • Last visited

  • Days Won

    52

Everything posted by cityliving

  1. A second construction crane base was delivered today at the construction site behind the current one. More octagonal shaped footings for foundation being filled with concrete.
  2. I am happy to report that the steel beams have started going up.....picks coming tomorrow.
  3. Two more truck loads of steel beams arrived this morning, I haven't seen the steel go up yet.
  4. Tall slender wall going up higher on parking structure and steel beams being unloaded.
  5. Octagonal shape footings for foundation, three done and many more to finish.
  6. Parking garage structure up to the sixth floor. I mistakenly posted two of the same pics, tried deleting one of them but couldn’t.😀
  7. Concrete Boom Pump filling in Piling.https://imgur.com/gallery/MUxUSgX
  8. Here is a pic of the Large crawler crane and a Concrete Boom Pump at the construction site today.https://imgur.com/gallery/rI7fKJg
  9. Yes, I saw the crawler crane as it was being assembled on site, it’s huge.
×
×
  • Create New...