Jump to content

Urbannizer

Moderator
  • Posts

    9,432
  • Joined

  • Last visited

  • Days Won

    948

Posts posted by Urbannizer

  1. So this one was first planned to be 29 floors, and to begin construction in 2008, but the economic conditions changed that. It was put on hold. Now its 16/17 floors and still on hold.

    Architect: WDG

    Developer JMI Realty

    New Rendering:

    hotelvanzandt.jpg

    Old Rendering:

    austinhotelvanzandtng0.jpg

    Info from JMI Realty Website:

    JMI Realty is developing the Hotel Van Zandt, a 307-room, 17-story, Kimpton Boutique Hotel conveniently located minutes away from the convention center, the Warehouse District and other popular downtown Austin destinations. When complete, the hotel will include amenities such as three levels of underground parking, a three-meal restaurant, a 6,800 square foot pool deck and bar, approximately 12,000 square-feet of meeting space and a 1,300 square foot excercise facility. Situated in the newly minted Waterfront District of downtown Austin, the project will be directly adjacent to and share amenities with The Shore, a Trammell Crow Company condominium project. The Van Zandt is expected to attract both business and leisure travelers given its opportune location. It is two blocks southeast of the Austin Convention Center, one block east of Town Lake, 1.8 miles from the Texas Capitol Building, and 1.6 miles from the University of Texas at Austin.

    The Van Zandt will be the only boutique hotel in downtown Austin and is designed to capture the unique attitude and culture of the community. JMI Realty believes that a trendy, upscale boutique hotel in downtown Austin will stand out among the competition in the market.

    http://www.jmirealty.com/projects/project_detail.php?property_id=21&type=3

    Most recent news fom Sept. 10th

    The Hotel Van Zandt, a 327-room hotel planned at Red River and Davis streets, also "is in a holding pattern waiting for the construction lending community to get back in business," said Greg Clay, chief investment officer for the project's developer, JMI Realty.

    http://www.statesman.com/news/content/news/stories/local/2009/09/10/0910hotel.html

  2. Spire

    http://www.wdgdallas.com/

    A 11.3 acre master plan development with 128,000 SF of retail, 1,664,700 SF of office and 337 residential units in Downtown Dallas.

    arielrendering.png

    siteplan.png

    2400 San Jacinto

    21 story building with two levels of below grade parking and seven levels of above grade parking. 360,570 square feet of office space, 21,320 square feet of retail space at street level. 36 residential flats and two story loft units at 1,300 square feet each.

    rendering.png

    lobbyn.png

    streetlevelrendering.png

    streetlevelrendering2.png

    streetlevelrendering3.png

    2500 Ross Ave

    19 levels, two below grade parking, six above grade parking. 590,000 square feet of office space, 18,000 square feet of retail space at street level. 6 story atrium connects all levels of parking with the buildings main elevators.

    rendering.png

    lobbyt.png

  3. Check it out, its VW Passat replacement. VW already released 2 skecthes of the unamed car, so someone came up with a render for it. Expect to see the car on the road in late 2011.

    Render:

    2011_MysteryVW.jpg

    Sketch:

    2011_VWSketch.jpg

    Thoughts?

  4. The car's butt looks like the illegitimate son of an Audi A5 and the Ford Mustang. Which of the two is the father or mother escapes me.

    Audi A5? The rear looks more like the Dodge Challenger's rear.

×
×
  • Create New...