Jump to content

DrLan34

Full Member
  • Posts

    1,401
  • Joined

  • Last visited

  • Days Won

    20

Posts posted by DrLan34

  1. http://www.constructionbusinessowner.com/news/mccarthy-breaks-ground-houston-metro-harrisburg-overpass

     

    The $27 million project will involve construction of a 2,400-linear-foot grade separation at the Houston Belt and Terminal (HBT) and Union Pacific Railroad (UPRR) railroad tracks located west of Hughes Road. It will include a bridge structure with aesthetic architectural features, two 16-foot wide vehicular traffic lanes, a 26-foot LRT guideway located in the center of the bridge structure, and two 5-foot wide emergency walkways on each side of the bridge. The project will also include aesthetic street lighting on top and underneath the structure, new storm drainage and 16-foot wide frontage roads and sidewalks with at-grade crossings over the HBT/UPRR railroad tracks. The overpass is set to be complete in only 12 months.

  2. http://www.bizjournals.com/houston/news/2015/04/15/new-apartment-project-breaks-ground-in-downtown.html

     

    Leon Capital Group broke ground earlier this month on a five-story, 220-unit apartment on city block 365, which is bounded by Austin, Caroline, Jefferson and Pease streets in the southwest quadrant of downtown. The unnamed Class A project is expected to be completed in the late 2016, according to Central Houston's quarterly downtown real estate report.

    • Like 1
  3. They broke ground yesterday...according to the report on Channel 2, it is supposed to take 18 months to complete, but they are offering incentives to get it finished faster

     

    Thanks for the update!

×
×
  • Create New...