Update as of 11-9-14.
- 6
-
A few more details:
"Construction has commenced on the Phillips 66 Corporate Headquarters, a brand new campus comprised of two parallel towers measuring 13 and 15 stories respectively, a parking garage on 14.2 acres in the Westchase District of Houston. It includes a 9-level, cast-in-place, 1,105,000-GSF parking garage (one below grade) with level 8 being a recreation area and soccer field. Phillips 66's Houston employees are currently split among three separate sites. Phillips 66 plans to relocate all Houston employees to the new campus upon the development's completion. Phillips 66's spokesperson, Dean Acosta, commented on the goal of creating a centralized environment, "It will be a great place to bring all Houston employees to one campus and to continue building a high performance team." Located off of Beltway 8 between Westheimer Road and Briar Forest Drive, the campus will accommodate over 1,800 employees and includes a café, fitness center, credit union, and brand new training center. The three-year undertaking is W.S. Bellows' largest project to date, employing 1,000 workers and 100 subcontractors. The development is predicted to have a long-lasting positive effect on the economy of the area. The campus is intended to achieve at least a LEED Silver certification from the U.S. Green Building Council." www.wsbellows.com
- 1
-
As of today. They are currently working on the 19th floor.
- 8
-
As of today. They are working on the 15th floor.
- 7
-
- Popular Post
- Popular Post
-
A few pictures from this weekend.
- 6
-
One tower crane was setup today on this site.
-
Looks like this project has started. Fence is up and dirt work has begun.
- 3
-
Google Earth has an updated image of the construction progess date 10-27-12.
-
Another rendering. Site work has begun.
-
As of today.
- 2
-
-
Some pictures of the cranes as of today.
Also check out this video.
- 2
-
http://www.mainplacehouston.com/pdf/Stacking%20Plan.pdf
See link above. This should answer the questions about floor stacking.
-
It looks like they have started construction on building #2 of Chasewood Crossing at Hwy 249 and Cypresswood next to Lowe's. The original plan was to build a second 6 story Class A 156,000 sq ft building next to the completed building.
-
Construction started a few months ago for the new St. Luke's Hospital at The Vintage.
"St. Luke's newest facility is coming the northwest Houston. Located just south of Vintage Park the facility is projected to be open by 2011. It will be approximately 3-5 stories tall and house between 80 and 100 beds. There will be approximately 50 to 70 active medical staff memebers and a medical office building of about 60,000 square feet."
- 1
-
As of today.
-
Friday, June 22, 2007
PinPoint to develop new Houston FedEx freight facility
Houston Business Journal
Developer PinPoint Commercial has been selected to develop and lease a 243-door, 153,853-square-foot, cross dock freight facility in Northwest Houston to FedEx Freight East Inc.
...
The terminal will be located at Houston-based PinPoint Commercial's 115-acre Satsuma Station Industrial Park near the intersection of Highway 290 and FM 1960, where it will occupy more than one-third of the total acreage.
...
The project is expected to open by the second quarter of 2008.
- 1
-
Update as of this weekend.
-
Could this be a rendering of 5 & 6 Chasewood?
I know they are getting close to finishing what is now 4 Chasewood. (Aerial phot below)
" In addition to the three existing buildings, the master plan is to develop three additional Class A office buildings totaling 545,000 square feet, each building with its own parking garage, plus a 200-room full-service hotel with conference facilities and restaurants on the remaining 22 acres of land. Four and Five Chasewood, each being ten-story buildings containing approximately 220,000 square feet of rentable area, are planned on the west portion of Chasewood Technology Park, the last building to be built, is designed to be a 5 story building with 105,000 square feet of rentable area located adjacent to One Chasewood." www.http://www.chasewoodpark.com/default.htm
-
Just thought I'd post some pictures of this project. Since there are none posted.
- 1
-
Starting on the 6th floor. Sorry for the bad picture quailty, it started pouring down right as I passed by.
- 1
-
Pictures from a few days ago during the rain.
-
This will be on the northwest corner. Look closely, the gas station, jack-in-the-box are in the rendering. You can also see BJ campus at the bottom of the picture across the road from them.
609 Main At Texas
in Downtown
Posted