HCTRA recently submitted their 2013-2020 Capital Improvement Projects... $1.9B. A map can be found on their site...

https://www.hctra.or...t_construction/ (Bottom of the page)

or the "official" (?) link... https://www.hctra.org/files/HCTRA_CIP_Project_Map_FY_2013-2020.pdf

Not newly known, but newly added projects include widening 8 all the way south back around to 10 (including the bridge), the missing 249 and BW8 / Hardy connection(s), Hardy widening up to the future 99 interchange, and the Tomball Tollway.

Link to comment
Share on other sites

I'm surprised that traffic on the BW8 ship channel bridge can warrant the new span. It definitely would be nice to have a roomier highway instead of the clausterphobic existing span.

I'm disappointed to see nothing planned on the Westpark Tollway. Since Metro has no plans to use their right-of-way strip west of the Hillcroft transit center, I was envisioning the possibility of widening the tollway between SH6 and BW8 and adding better connections at BW8.