SkylineView Posted September 3, 2012 Share Posted September 3, 2012 HCTRA recently submitted their 2013-2020 Capital Improvement Projects... $1.9B. A map can be found on their site...https://www.hctra.or...t_construction/ (Bottom of the page)or the "official" (?) link... https://www.hctra.org/files/HCTRA_CIP_Project_Map_FY_2013-2020.pdfNot newly known, but newly added projects include widening 8 all the way south back around to 10 (including the bridge), the missing 249 and BW8 / Hardy connection(s), Hardy widening up to the future 99 interchange, and the Tomball Tollway. Link to comment Share on other sites More sharing options...
MaxConcrete Posted September 3, 2012 Share Posted September 3, 2012 I'm surprised that traffic on the BW8 ship channel bridge can warrant the new span. It definitely would be nice to have a roomier highway instead of the clausterphobic existing span.I'm disappointed to see nothing planned on the Westpark Tollway. Since Metro has no plans to use their right-of-way strip west of the Hillcroft transit center, I was envisioning the possibility of widening the tollway between SH6 and BW8 and adding better connections at BW8. Link to comment Share on other sites More sharing options...
JLWM8609 Posted September 5, 2012 Share Posted September 5, 2012 I'm surprised to see that direct connectors at the 288/BW8 interchange are not planned. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.