- Popular Post
hldjhn987
-
Posts
52 -
Joined
-
Last visited
-
Days Won
2
Content Type
Profiles
Forums
Events
Posts posted by hldjhn987
-
-
Update as of 11-9-14.
- 6
-
As of today. They are currently working on the 19th floor.
- 8
-
As of today. They are working on the 15th floor.
- 7
-
- Popular Post
- Popular Post
-
A few pictures from this weekend.
- 6
-
Looks like this project has started. Fence is up and dirt work has begun.
- 3
-
Google Earth has an updated image of the construction progess date 10-27-12.
-
Another rendering. Site work has begun.
-
As of today.
- 2
-
-
Some pictures of the cranes as of today.
Also check out this video.
- 2
-
http://www.mainplacehouston.com/pdf/Stacking%20Plan.pdf
See link above. This should answer the questions about floor stacking.
-
Update as of this weekend.
-
Just thought I'd post some pictures of this project. Since there are none posted.
- 1
-
Not the best pictures but they show the overall size of this project.
The pictures are from this wekend not 2/12/2006.
-
I few pictures from this weekend.
The building has made it to the 30th floor and they have started putting on the windows.
-
This is the logo from their website which is a resemblance of the building's shape.
-
Energy Center II is now topped out at 13 stories.
- 1
-
-
Any word on when they will start construction on these buildings?
Looks like the 22 story building would be next in line as building #5.
Nice brochure from their website.
http://citywestplacehouston.com/CityWestPl...%20Brochure.pdf
- 1
-
KHOU had a special last night on green buildings including Discovery Tower and the new BP building under construction.
-
-
-
609 Main At Texas
in Downtown
Posted