area
-
Posts
15 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Posts posted by area
-
-
- Popular Post
- Popular Post
-
On 10/10/2016 at 10:27 PM, cloud713 said:
I never noticed the open area on the back side of the top floor. Anyone know what will be on that side?
Two pretty massive cooling towers
- 1
-
On 6/14/2016 at 6:13 AM, HoustonMidtown said:
It's 564 sq ft - that's a studio according to http://www.marketsquaretower.com/residences/#sp
The smallest 1 BR is 814 sq ft
Ah I see that now. Well the pictures come from the 1BR model unit (GL layout I believe).
-
On 6/8/2016 at 10:08 AM, HoustonMidtown said:
I think that's actually a studio even though the Martha Turner listing says 1BR
This is the model unit --- it's a 1BR.
-
4 hours ago, bobruss said:
I'm confused. At the beginning of this thread there are renderings of this project from Ryan Jackson architects,
however when you go to their website and look under Our Work or Under Construction it has no mention of this project.
You would think with the scope of this project they would mention it on their site. Can anyone shed some light on who is the architects
for this building? THANKS
Hover on "Work In Progress" then click "Under Construction" that appears just underneath.
Or click here:
http://www.jacksonryan.com/work-in-progress/under-construction
-
Rooftop cantilevered pool outriggers look to be complete!
-
-
Wow, I just noticed that they put the Cooling Tower on the second floor. That is going to suck for the apartments right above it. All to save a few hundred LF of pipe and horsepower on CW pumps.
It's temporary -- that's a future pool deck
-
Are those new garage beams there to attach a new facade onto? Hoping.. heh.
These channels will more than likely hold the metal lath for plaster
- 2
-
If you go to the direct link to my pics above in super jumbo form, you can see that the floor that they are working now is different than the ones that they have put in below. I think they are close to topping this thing out.
They just finished the last residential (penthouse) slab. They're building the forms for the massive outriggers that will straddle the pool on the amenity deck.
- 2
-
i will be inviting everyone here and you have my word on it! The views on the rooftop are going to be awesome! Anyone know how I can get in contact with their leasing office?
Leasing office should be open in April 2016
- 1
-
Tower crane will need to be jumped at least one more time. I count 36 floors.
December 7-8 barring any weather delays
- 6
-
- Popular Post
- Popular Post
-
Probably going to need one more tower crane jump. 33 stories so far.
2 more; one scheduled for 10/25-26 and one scheduled for 11/28-29
- 7
Market Square Tower: 40-Story High-Rise At 777 Preston St.
in Downtown
Posted
They don't worry about furniture -- ideally it can get moved inside in heavy winds. They do make sure all planting materials (ie: gravel) is securely held down and even look at the engineering of any cabinet hinges.