Jump to content

jdkamerer

Full Member
  • Posts

    3
  • Joined

  • Last visited

Posts posted by jdkamerer

  1. You need to read the easement agreement, the easement is typically below and above ground to the sky.   Underground utility (electric and/or communications) easements typically preclude "structure" within the easement, thus anything hanging over the easement may hinder the utility company to gain direct access in case of an emergency or repair to the line below ground.  In terms of can "it" be done, pretty much everything can be engineered,  just depends on how much you are willing to spend.

  2. I check the Forbes List Every Year for Cities with the Most New Construction.

     

    Houston has been in the Top 3.

    It often goes

    1. NYC

    2. Dallas

    3. Houston

     

    Check out 2014 for some pinnacle of the boom bragging rights.

     

    http://www.forbes.com/sites/erincarlyle/2014/11/11/building-boom-towns-metro-areas-with-the-most-new-construction-in-2014/

     

    For 2015 article head here:

     

    www.forbes.com/sites/erincarlyle/2015/01/27/americas-fastest-growing-cities-2015/

     

    01. Houston

    02. Austin

    03. Dallas

    08. Fort Worth

    10. San Antonio

    • Like 1
×
×
  • Create New...