Jump to content

Makeover Of The East Loop 610 Sidney Sherman Bridge


Recommended Posts

Feeder rd bridges must be constructed and be higher than the current bridge to avoid taller ships from bumping into it! Must be a total of 8 lns! The feeder rd bridges are to take of traffic from the main rd due too just going to the next intersection! Also, traffic to exit in advance to avoid traffic to back up on the main rd! Also for traffic getting on to get on the main rd later! The main rd must be raised higher and be widened to 12 lns! Two cable towers must be added to become a cable stayed bridge like the bridges in Jacksonville, Fl, Savannah, Ga, and Charleston, SC! 

Edited by BhutcA
Correcting.
Link to comment
Share on other sites

Two new bridges must be constructed for feeder rd bridges and be higher than the current bridge to avoid taller ships from bumping into the bridge! The feeder rd bridges must be a total of 8 lns! The feeder rd bridges take of traffic going to the next intersection from the main rd! Also, traffic can exit in advance to avoid traffic backups on the main rd! Also, traffic getting on can get on the main rd later! The main bridge is raised higher and be widened to 12 lns! Two cable towers must be constructed on the bridge to be a cable stayed bridge like the bridges in Jacksonville, Fl, Savannah, Ga, and Charleston, SC! 

Link to comment
Share on other sites

  • The title was changed to Makeover Of The East Loop 610 Sidney Sherman Bridge

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...