Since we Don't have Subforums for various "Villages" or Spring Branch, so I'll be putting these here for now.


In 2017 the residents of Spring Branch ISD passed a Bond Referendum. A major project, Memorial High School, is on the eve of a proposed high school reconstruction. In the first phase, several wings of the existing building will be demoed as well as existing tennis courts. The courts will be moved across the street to the east to make way for a 4 story expansion building and plaza. The other work consists of minor patchwork renovations which signals that this won't be only phase. I'm sure they will probably rebuild the entire school piece by piece.
.

Developer: SBISD

 

Architect: Stantec

 

Estimated Completion: 2Q 2022


Bond Info:

 

https://www.springbranchisd.com/about/bond-2017/campus-bond-work/memorial-high-school

 

Quote

SUMMARY OF PROPOSED WORK

The project is slated to receive scopes of work which include both renovation and new construction. The new construction scope of work includes the replacement of some classrooms areas and site modifications. In an effort to ensure that all new construction scope of work within the 2017 Bond Program is properly planned and built for maximum future campus development, the district will be establishing a master plan.

The campus will also receive new classroom furniture, technology student devices, new instruments, uniform replacements for the Fine Arts program and athletic upgrades (i.e. track and tennis/sport court resurfacing, and field refurbishing). A synthetic turf practice field will also be installed.

Since opening its doors in 1962, MHS has received several renovations and additions. The campus consists of 311,115 square feet. MHS had an enrollment of 2,645 in 2017-2018.

 
Scope of Work
Master plan phasing project for the replacement of classroom wings. New construction to replace partial classroom wings. Exterior/interior upgrades, athletic upgrades. 

Project Status
Design Phase -- Project Advisory Team (PAT)

 

SBISD Presentation (May 30, 2019):

 

https://v3.boardbook.org/Public/PublicItemDownload.aspx?ik=44562189

 

Animation walkthrough:

 

 

Images from presentation:

 

y8Zb1Ky.jpg

 

tilrt5b.jpg

 

6y8vhc1.jpg

 

4Xi0lye.jpg

 

OXlmmOQ.jpg

 

jei5ZSz.jpg

 

kEgDolw.jpg

 

5pIj9ks.jpg

 

xbDalJH.jpg

 

WvHnIYy.jpg

 

U4G1Lhf.jpg

 

UQ2EXqj.jpg

 

Neb4ESs.jpg

Link to comment
Share on other sites

  • The title was changed to Memorial High School Renovations
  • The title was changed to Memorial Senior High School At 935 Echo Ln.

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...