Spring Branch ISD School Developments


Luminare

Recommended Posts

Since we Don't have Subforums for various "Villages" or Spring Branch, so I'll be putting these here for now.

 

In 2017 the residents of Spring Branch ISD passed a Bond Referendum. Several of the projects are proposed renovations/use of spaces at Buffalo Creek, Cedar Brook, and Treasure Forest Elementary Schools. Since all three have similar scopes, all the same buildings just in different locations, and are hiring the same architect for all three, I'm combining them into one thread. The exception the three is Cedar Brook which is getting a classroom addition.

 

Developer: SBISD

 

Architect: Pfluger

 

Estimated Completion:
       Buffalo Creek - 3Q 2020
       Cedar Brook - 3Q 2021

       Treasure Forest - 3Q 2020


Bond Info:

       Buffalo Creek - https://www.springbranchisd.com/about/bond-2017/campus-bond-work/buffalo-creek-elementary
 

 

Quote

SUMMARY OF PROPOSED WORK

This project will consist of safety and security upgrades, educational specifications upgrades, and building systems upgrades. In addition, the campus will receive new classroom furniture and student technology devices. 

Buffalo Creek opened its doors in 1997 and has remained in good condition. The campus consists of 82,179 square feet with a 2017-2018 student enrollment of 553. 

Scope of Work

The Scope of Work is to be determined.


Project Status

Design phase



       Cedar Brook - https://www.springbranchisd.com/about/bond-2017/campus-bond-work/cedar-brook-elementary

 

Quote

SUMMARY OF PROPOSED WORK

The project will provide a multi-classroom addition to relieve the current overcrowding and to accommodate for projected student growth. The renovation project will also address safety and security as well as educational specifications. Cedar Brook Elementary will received new classroom furniture and student technology devices.

Opening its doors in 1993, Cedar Brook is a relatively new school in SBISD. The campus consists of 82,179 square footage with a 2017-2018 student enrollment of 795. 

Scope of Work

The detailed Scope of Work is to be determined.


Project Status

Design Phase

 

       Treasure Forest - https://www.springbranchisd.com/about/bond-2017/campus-bond-work/treasure-forest-elementary
 

 

Quote

SUMMARY OF PROPOSED WORK

This project will consist of safety and security upgrades, educational specifications upgrades, and building systems upgrades. In addition, the campus will receive new classroom furniture and student technology devices. 

Treasure Forest opened its doors in 1996 and has remained in good condition. The campus consists of 82,149 square feet with a 2017-2018 student enrollment of 548. 

 
Scope of Work

The Scope of Work is to be determined.


Project Status

Design stage


Images from presentations:

AnZSz7f.jpg

 

8DmNpvx.jpg

 

mzD0uLa.jpg

 

n5a7HAG.jpg

 

cVLWkeR.jpg

 

Dy3UR5o.jpg

 

3V9c8xj.jpg