Jump to content
Sign in to follow this  
samagon

lockwoood resurface

Recommended Posts

Posted (edited)

they stripped the surface asphalt off the NB lanes from about 45 to Polk. the equipment is silent and hasn't moved in weeks.

 

why is it taking so long for this project to move?

Edited by samagon

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
Sign in to follow this  

×
×
  • Create New...