Urbannizer Posted February 24, 2018 Share Posted February 24, 2018 Currently on the Houston Planning Commission agenda. 8 Quote Link to comment Share on other sites More sharing options...
dml423 Posted February 24, 2018 Share Posted February 24, 2018 I was wondering what eventually would go there. I used to live in Cottage grove and would always drive by it in the mornings when I would go to work. They used to have a small billboard that said some sandwich shop was coming soon. I guess they found a higher bidder. 2 Quote Link to comment Share on other sites More sharing options...
htownbro Posted February 26, 2018 Share Posted February 26, 2018 (edited) need more floors... Edited February 26, 2018 by htownbro 3 Quote Link to comment Share on other sites More sharing options...
Purdueenginerd Posted February 28, 2018 Share Posted February 28, 2018 Theres already activity at this site. Looks like some foundation elements have been poured recently. Is this a different office building than the one under construction? This building might be closer to the corner than the one under construction. 2 Quote Link to comment Share on other sites More sharing options...
Urbannizer Posted March 7, 2018 Author Share Posted March 7, 2018 https://www.virtualbx.com/construction-preview/25219-houston-multifamily-complex-to-expand-5-story-office-project-delayed.html Gold Quest Group LLC, a residential/commercial brokerage firm, controls a vacant lot at the northeast corner of the Interstate 10 frontage road and Radcliffe Street near TC Jester Road. The firm retained the services of The Woodlands office of BDC Nomadas, a multi-national architectural firm that was founded in Venezuela. Previous projects by BDC Nomadas include The Woodlands Gate complex, the Valencia Town Center and the Special Education Institute, both in Venezuela, BDC Nomadas is designing a five-story office building on a lot of about one-third of an acre. Vehicles will enter the building and park at ground level or one story above. Ground level parking will be screened on all sides, except for the entrance, by a landscape earthen berm. The second and third floors are dedicated for office use. The fifth story will have an enclosed garden. BDC Nomadas brought the case to the commission to request a variance for a 10-foot building line instead of the required 25 feet. The report to the commission said, "The intent of the developer is to create a commercial property that would create an urban feel by including a walkable environment and a building that is aesthetically pleasing. This property was previously platted as a single family residential subdivision with a 10-foot build line located along the Katy Freeway service road, Radcliffe Street, and Cornish Street."In its current state, the property has one 6-foot sidewalk that is located along the Katy Freeway service road. In order for the client to be able to provide enough parking, square footage for commercial use, and to implement the pedestrian realm ordinance they are requesting a reduced building setback variance." The sidewalk on the I-10 frontage will be relocated and widened, and it will continue around the block to Radcliffe and Cornish streets. Trees and green space will be installed between the sidewalk and the right-of-way. Benches will be installed between the sidewalk and the building. The Planning Commission considered the case March 1 and deferred the plat upon staff's recommendation so that the developer could have more time to submit project information. 3 Quote Link to comment Share on other sites More sharing options...
Purdueenginerd Posted March 7, 2018 Share Posted March 7, 2018 So that basically confirms the construction thats going on at the site right now is for another office building adjacent to it. Looks like this property is only taking up 1/3rd. The current construction is about 2/3rds. I'll try to head over there this weekend, looks like they had drilled piers constructed already. 2 Quote Link to comment Share on other sites More sharing options...
Urbannizer Posted June 14, 2019 Author Share Posted June 14, 2019 This is on the agenda again. Still proposed as office; same architect. 4 Quote Link to comment Share on other sites More sharing options...
Purdueenginerd Posted June 15, 2019 Share Posted June 15, 2019 Since then theres been another small office building 3-4 story put up adjacent to the lot. Dont think theres a thread for the other building. 3 Quote Link to comment Share on other sites More sharing options...
cuarto Posted June 25, 2019 Share Posted June 25, 2019 Did this pass the recent commission vote? Hoping this building moves forward as is...seems pretty unique for the area. 1 Quote Link to comment Share on other sites More sharing options...
Urbannizer Posted February 11, 2020 Author Share Posted February 11, 2020 Pg 22. https://issuu.com/jesuscabrera48/docs/_proyectos 6 Quote Link to comment Share on other sites More sharing options...
hindesky Posted February 11, 2020 Share Posted February 11, 2020 (edited) Edited February 11, 2020 by hindesky 6 Quote Link to comment Share on other sites More sharing options...
Amlaham Posted June 20, 2022 Share Posted June 20, 2022 Building permit up! 3 Quote Link to comment Share on other sites More sharing options...