Jump to content
Naviguessor

Beltway 8 / Ship Channel Bridge Replacement

Recommended Posts

Sounds like someone's errors and omissions insurance may come into play. 

Share this post


Link to post
Share on other sites
On 3/19/2020 at 1:38 AM, Tumbleweed_Tx said:

rip it down and hire someone competent.

That's probably the exact thing that's going to have to happen. Unless there's some way to add extra supports but if there's a problem with the very foundation, I imagine they would have to demo and start over. @Purdueenginerd ?

Share this post


Link to post
Share on other sites

That's a really good explanation, PE, not a wall of text.  Thanks.

  • Thanks 1

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...

×
×
  • Create New...