They finished up the parking garage and are disassembling the tower crane today   Skyhouse almost done by Christopher Hisle, on Flickr   Almost topped off Skyhouse almost done by Christopher Hisl

Blue and red lighting at night

Posted Images

334 should top off soon now that it is mainly wood framing from now on. I see them taking forever on the interior and exterior work though.

The thing with skyhouse, once they get the foundation and groundwork done, the floors fly up. Just about one a week. So 334 SHOULD top off in 3 months and shyhouse in about 7. But the might be delivered at the same time.

If skyhouse tops off before 334, then the contractor needs to take up a new job cooking molasses or something

  • Like 2
Link to post
Share on other sites

334 should top off soon now that it is mainly wood framing from now on. I see them taking forever on the interior and exterior work though.

The thing with skyhouse, once they get the foundation and groundwork done, the floors fly up. Just about one a week. So 334 SHOULD top off in 3 months and shyhouse in about 7. But the might be delivered at the same time.

If skyhouse tops off before 334, then the contractor needs to take up a new job cooking molasses or something

Not gonna happen...

vsmjko.jpg

  • Like 6
Link to post
Share on other sites

yeah, i talked to a site manager(?) a little while back at SkyHouse River Oaks and he said his crew would be moving over to this one soon.

does anyone know when this SkyHouse was announced in relation to when SkyHouse RO broke ground, or SkyHouse RO compared to SkyHouse Houston? I'm wondering if/when we might expect an announcement for a SkyHouse 4. IMO that will be the announcement, or lack there of, that shows how bullish these guys really are on Houston. I'm not sure they would of moved forward with this one, given the recent shift in market confidence, if it weren't for the downtown incentives.

  • Like 2
Link to post
Share on other sites
  • 3 weeks later...
  • 2 weeks later...
  • 2 weeks later...

Hope they can fill another one..  I wonder how leased up the first one is as of May? 

 

I know it's not a good indicator, but I do see cars coming and going from Skyhouse more often, as well as the street parking on Leeland more used during the day

 

Incidentally, is the Skyhouse garage resident only?  Or will retail customers eventually get to park in it?

Link to post
Share on other sites
  • 3 weeks later...
  • 3 weeks later...
  • 2 weeks later...
  • 2 weeks later...

I don't understand, why don't they integrate the garages into the base of the building? I know it would be more expensive, but it would also let them only use half the land they do now. Also, I think the residents could really benefit from being able to hop on an elevator straight out of the garage and get to their floor.

 

It's like their lean operations forced them to engineer out a pretty intuitive feature.

  • Like 2
Link to post
Share on other sites
  • Highrise Tower changed the title to SkyHouse Main Planned for Block 368

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...



×
×
  • Create New...