After sitting in my backyard watching up close the construction of the Menil drawing center I have been able to see all of the things

that take so long to get a building out of the ground. The amount of time to just put all of the rebar together for the structural

elements that go into the columns and walls of these buildings. It takes them quite a while to tie all of that rebar together.

They are just starting to take the forms off of the first wall in the basement and its taken probably three weeks of tying rebar

together, just to build this one wall. Concrete wok is labor intensive.

  • Like 8
Link to comment
Share on other sites

After sitting in my backyard watching up close the construction of the Menil drawing center I have been able to see all of the things

that take so long to get a building out of the ground. The amount of time to just put all of the rebar together for the structural

elements that go into the columns and walls of these buildings. It takes them quite a while to tie all of that rebar together.

They are just starting to take the forms off of the first wall in the basement and its taken probably three weeks of tying rebar

together, just to build this one wall. Concrete wok is labor intensive.

you almost have to wonder how long before there's a huge 3d rebar printer...

  • Like 2
Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...