Avossos Posted November 20, 2014 Share Posted November 20, 2014 so whats the estimated delivery on this? Quote Link to comment Share on other sites More sharing options...
toxtethogrady Posted November 24, 2014 Share Posted November 24, 2014 11/22. A bit rainy on Main: 9 Quote Link to comment Share on other sites More sharing options...
Triton Posted November 24, 2014 Share Posted November 24, 2014 Nice update! Quote Link to comment Share on other sites More sharing options...
Alec Posted December 3, 2014 Share Posted December 3, 2014 12/3. I'm surprised how quickly this went vertical. 5 Quote Link to comment Share on other sites More sharing options...
Purdueenginerd Posted December 3, 2014 Share Posted December 3, 2014 Alec, Do you got a higher resolution image on that? It looks like their steel reinforcement for the colums are angled, Am I seeing that correctly or have just not finished setting them in place? Quote Link to comment Share on other sites More sharing options...
Luminare Posted December 3, 2014 Share Posted December 3, 2014 I'm going to jump right in and say that this is normal for rebar to do that before they put the form work in place to create the column. Another is just the image. It looks like the image is compressed so it's exaggerating that. Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted December 14, 2014 Share Posted December 14, 2014 Crane base 8 Quote Link to comment Share on other sites More sharing options...
phillip_white Posted December 29, 2014 Share Posted December 29, 2014 I'm happy how quickly this and MATCH are going up. Quote Link to comment Share on other sites More sharing options...
BigFootsSocks Posted December 29, 2014 Share Posted December 29, 2014 Was riding the Red Line back on Saturday and noticed a crane base installed. ...and just realized two posts above me was that crane base. This is what I get for not reading threads Quote Link to comment Share on other sites More sharing options...
Avossos Posted December 29, 2014 Share Posted December 29, 2014 Just drove by this. I am excited to see this happen. 1) nice density 2) getting people to the cool part of midtown 3) good design 4) the net effects to the area question: is there an office portion of this that is planned? If so, is it under construction, or a different phase? Quote Link to comment Share on other sites More sharing options...
cloud713 Posted December 29, 2014 Share Posted December 29, 2014 Just drove by this. I am excited to see this happen. 1) nice density 2) getting people to the cool part of midtown 3) good design 4) the net effects to the areaquestion: is there an office portion of this that is planned? If so, is it under construction, or a different phase?Yes. A 16 story office high rise across Main. Not sure when it's supposed to start though? Quote Link to comment Share on other sites More sharing options...
Avossos Posted December 29, 2014 Share Posted December 29, 2014 We're going to see a groundbreaking within 60 days on Mid Main for a new parking garage and multifamily units. (Nobody tell the ground though, it might get scared and run away.) Developer RHS Interests selected Transwestern to lease the office portion, which should move some dirt of its own when the ink starts to dry on preleasing. Mid Main is a 215k SF mixed-use project, which includes 203k SF of Class-A office. Transwestern's Doug Little and David Lee are marketing that space. David tells us the eight-story building will be at 3501 Main St (along the light rail) and is a unique blend of transit-oriented office space and a lifestyle center element that should be great for recruiting employees. Mid Main's office space will have nearly 10,000 SF of retail, and RHS is also building a 363-unit multifamily building with another 20k SF of retail. It's adjacent to Midtown Arts & Theater Center (MATCH), which broke ground last month. Lewis Property Co's Greg Lewis is leasing the retail space. Construction on the garage will begin immediately, with the office tower breaking ground when it secures a lead tenant. It's scheduled for completion in spring 2016. - http://www.bisnow.com/commercial-real-estate/houston/1872-the-deal-sheet/ I get the feeling this wont start construction anytime soon... The only reason why I say that is all the oil price talk. BUTTT.... you never know. I would love to see this go up. Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted January 10, 2015 Share Posted January 10, 2015 (edited) Badass, crane going up Edited January 10, 2015 by DrLan34 5 Quote Link to comment Share on other sites More sharing options...
Triton Posted January 10, 2015 Share Posted January 10, 2015 Badass, crane going up This is MATCH, not Mid Main btw. 1 Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted January 10, 2015 Share Posted January 10, 2015 This is MATCH, not Mid Main btw. haha I captured the MATCH in front to show the level of construction activity. That is the crane for Mid Main. Quote Link to comment Share on other sites More sharing options...
Triton Posted January 10, 2015 Share Posted January 10, 2015 haha I captured the MATCH in front to show the level of construction activity. That is the crane for Mid Main.Oh nice! 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted January 10, 2015 Share Posted January 10, 2015 Tower crane is going up for Mid Main 7 Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted January 12, 2015 Share Posted January 12, 2015 Cranes left to right. 1. The Hamilton Apartments 2. Alexan Midtown 3. Pearl Phase II4. The MATCH 5. Mid Main (Still being assembled) Broadstone Phase II crane just to the right of this picture. 7 Quote Link to comment Share on other sites More sharing options...
Purdueenginerd Posted January 12, 2015 Share Posted January 12, 2015 Great View. I like the look of the rowhouses in midtown Quote Link to comment Share on other sites More sharing options...
ChannelTwoNews Posted January 15, 2015 Share Posted January 15, 2015 Back in town! Just saw a bunch of concrete trucks pumping at the site. 1 Quote Link to comment Share on other sites More sharing options...
Triton Posted January 17, 2015 Share Posted January 17, 2015 Mid-Main by marclongoria, on Flickr Mid-Main by marclongoria, on Flickr 6 Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted January 18, 2015 Share Posted January 18, 2015 (edited) Cranes left to right. 1. The Hamilton Apartments 2. Alexan Midtown 3. Pearl Phase II4. The MATCH 5. Mid Main (Still being assembled) Broadstone Phase II crane just to the right of this picture. Cranes left to right. 1. Dolce Living at Midtown West Crane2. Dolce Living at Midtown East Crane3. The Hamilton Apartments4. Alexan Midtown5. Pearl Phase II6. Mid Main North Crane7. Mid Main South Crane8. Broadstone Phase II Edited January 18, 2015 by DrLan34 1 Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted January 19, 2015 Share Posted January 19, 2015 (edited) Cranes left to right. 1. Dolce Living at Midtown West Crane2. Dolce Living at Midtown East Crane3. The Hamilton Apartments4. Alexan Midtown5. Pearl Phase II6. Mid Main North Crane7. Mid Main South Crane8. Broadstone Phase II Edited January 19, 2015 by DrLan34 3 Quote Link to comment Share on other sites More sharing options...
Alec Posted January 30, 2015 Share Posted January 30, 2015 Not sure how long it's been there, but there is a second crane base on the far south side of the site, about 5 feet from Natachee's. 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted January 31, 2015 Share Posted January 31, 2015 Second tower crane base I spotted while eating breakfast at Natachee's this morning. At first I thought it might be another section for the crane already up but then it seems like the first crane is probably as high as it needs to be and the second base has electrical hook ups set at it's base. Plus the first crane can't even come close to reaching this part of the project. 7 Quote Link to comment Share on other sites More sharing options...
hindesky Posted February 2, 2015 Share Posted February 2, 2015 2nd Tower Crane is going up today, TNT and Diamondback Hoist and Rigging, the 2 companies that removed the tower crane at UH Downtown. Probably the same crane form UHD too. Pics are downloading will post them soon. 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted February 2, 2015 Share Posted February 2, 2015 8 Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted February 3, 2015 Share Posted February 3, 2015 Crane City 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted February 3, 2015 Share Posted February 3, 2015 Crane CityI believe that will be #7 tower crane for midtown alone Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted February 9, 2015 Share Posted February 9, 2015 Garage ramp and second crane. 1 Quote Link to comment Share on other sites More sharing options...
Popular Post hindesky Posted February 9, 2015 Popular Post Share Posted February 9, 2015 10 Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted February 21, 2015 Share Posted February 21, 2015 (edited) - Edited February 21, 2015 by DrLan34 7 Quote Link to comment Share on other sites More sharing options...
por favor gracias Posted February 22, 2015 Share Posted February 22, 2015 The view from the ramp coming onto 45 North from 288 today was incredible. There may be 25 visible cranes or more from that spot right now. 4 Quote Link to comment Share on other sites More sharing options...
toxtethogrady Posted February 22, 2015 Share Posted February 22, 2015 The view from the ramp coming onto 45 North from 288 today was incredible. There may be 25 visible cranes or more from that spot right now. Okay, so you're the guy screwing up that ramp by slowing down... 3 Quote Link to comment Share on other sites More sharing options...
LTAWACS Posted February 23, 2015 Share Posted February 23, 2015 The view from the ramp coming onto 45 North from 288 today was incredible. There may be 25 visible cranes or more from that spot right now.Try to take a pic please. Quote Link to comment Share on other sites More sharing options...
por favor gracias Posted February 23, 2015 Share Posted February 23, 2015 Okay, so you're the guy screwing up that ramp by slowing down... Yup, that's me allright...what's the big deal?? Quote Link to comment Share on other sites More sharing options...
por favor gracias Posted February 23, 2015 Share Posted February 23, 2015 (edited) Try to take a pic please. Pensé en hacer eso, pero yo no quería cabrear toxtethogrady... Edited February 23, 2015 by por favor gracias 4 Quote Link to comment Share on other sites More sharing options...
Howard Huge Posted February 23, 2015 Share Posted February 23, 2015 Pensé en hacer eso, pero yo no quería cabrear toxtethogrady...Hacerlo. Toxtethogrady es nadie. 2 Quote Link to comment Share on other sites More sharing options...
LarryDierker Posted February 24, 2015 Share Posted February 24, 2015 1 Quote Link to comment Share on other sites More sharing options...
BigFootsSocks Posted February 24, 2015 Share Posted February 24, 2015 Jajajaja 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted March 7, 2015 Share Posted March 7, 2015 7 Quote Link to comment Share on other sites More sharing options...
Popular Post PeopleAreStrange Posted March 14, 2015 Popular Post Share Posted March 14, 2015 I took this on Wednesday while riding the red line: 10 Quote Link to comment Share on other sites More sharing options...
hindesky Posted April 4, 2015 Share Posted April 4, 2015 8 Quote Link to comment Share on other sites More sharing options...
hindesky Posted April 26, 2015 Share Posted April 26, 2015 3rd floor work on the north end of the project. 9 Quote Link to comment Share on other sites More sharing options...
Popular Post LarryDierker Posted May 1, 2015 Popular Post Share Posted May 1, 2015 20150430_154830 by Not.Larry.Dierker, on Flickr 20150430_154823 by Not.Larry.Dierker, on Flickr 11 Quote Link to comment Share on other sites More sharing options...
hindesky Posted May 2, 2015 Share Posted May 2, 2015 9 Quote Link to comment Share on other sites More sharing options...
monarch Posted May 2, 2015 Share Posted May 2, 2015 wow hindesky! you have been incredibly busy. simply amazing work. all that i ask, is that you are thinking safety first, and donning a hard hat within these construction areas. rock on.... Quote Link to comment Share on other sites More sharing options...
DrLan34 Posted May 19, 2015 Share Posted May 19, 2015 The team has also restored the surrounding buildings from the turn of the century, and next up it's restoring 3617 Main across the street—the building was the original location of the Alley Theatre.https://www.bisnow.com/houston/news/multifamily/montrose-still-has-a-huge-pipeline-45952 5 Quote Link to comment Share on other sites More sharing options...
Howard Huge Posted May 20, 2015 Share Posted May 20, 2015 Does anyone know whats to become of the Antique store across the street? Is that place even open?? I never see anyone in there, ever. Those storefronts are prime retail space though, when Mid Main is complete and all the retail moves in this area could be amazing if you had retail on BOTH sides of Main street and not just the Natachees/Continental Club side. 4 Quote Link to comment Share on other sites More sharing options...
phillip_white Posted May 20, 2015 Share Posted May 20, 2015 A few of the storefronts are remodeled, but I think the owners have put all of their focus on building Mid Main. I would imagine there will be a lot of interest in those vacant units once the behemoth completes. Perhaps they're just holding off before signing leases so they can lock in as much rent as possible? I could be wrong though... maybe there's a ghost that needs extracting.Does anyone know whats to become of the Antique store across the street? Is that place even open?? I never see anyone in there, ever. Those storefronts are prime retail space though, when Mid Main is complete and all the retail moves in this area could be amazing if you had retail on BOTH sides of Main street and not just the Natachees/Continental Club side. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.