Jump to content

Texaco Building At 1111 Rusk St.


editor

Recommended Posts

The quarter 4 of 2015

 

If that happens to work out, they are going to be flying over there for the next 5 months.  They haven't drilled a piling or anything for the garage section. I'm guessing that they have just declined to update off of what they originally told the development folks.

Link to comment
Share on other sites

If that happens to work out, they are going to be flying over there for the next 5 months.  They haven't drilled a piling or anything for the garage section. I'm guessing that they have just declined to update off of what they originally told the development folks.

 

Either that, or they're going to borrow a Skyhouse crew.

 

  • Like 1
Link to comment
Share on other sites

They claimed they were 50% in January but I had a hard time believing that, too.

I walked by it on Friday and saw they had made a lot of progress in getting the studs in for the walls on the lower floors, but that still leaves a lot to finish. I see absolutely no way they will complete this on schedule.

Link to comment
Share on other sites

  • 3 weeks later...
  • 3 weeks later...

You can see in my last pic that they have poured "balconies" jutting out from the new steel section. They may be connection points to the eventual garage that is supposed to go there rather than actual balconies, but details on this thing are pretty sparse. They have done a lot of heavy restoration work on the exterior, and they are moving forward with the interior work on the tower closest to Fannin in addition to what they are adding on here to the back side. 

 

609 is supposed to be open for tenants by the end of 2016 (I think), They are going to have to find another gear to beat that on this building. There still has been zero prep for the garage along the Capitol side.

Link to comment
Share on other sites

So now they have a whole 2 months to re-clad the exterior, build out the interior walls, install all the furnishings, replace/repair any broken exterior windows, and build a parking garage that can hold a residential tower on top of it a later date.  Yep sounds like they're right on schedule for a 4Q 2015 opening

  • Like 4
Link to comment
Share on other sites

  • 2 weeks later...

So now they have a whole 2 months to re-clad the exterior, build out the interior walls, install all the furnishings, replace/repair any broken exterior windows, and build a parking garage that can hold a residential tower on top of it a later date.  Yep sounds like they're right on schedule for a 4Q 2015 opening

 

 

Piece of cake...

 

uJsjD0m.jpg?2

  • Like 7
Link to comment
Share on other sites

Any guesses on this one? Another year before the first tenant moves in?

If one believe the original schedule as published on the downtownhouston map, this project should have been wrapping up about now. Did they have a major design change or did they encounter a whole host of unknowns? Anyone have any intel?

 

I have absolutely no inside info, but just observing the progress, once they had the interior gutted, things went really slow with just bits and pieces of exterior work visible. Interior work definitely continued on the part with the green back on it now such that it may be farther along than we know, but I can’t imagine that they could open that part up for residents while the rest of it is still an active heavy construction site with no parking garage.

 

My guess is they threw out an optimistic date at some point and never updated it. All of the steel framing that has gone up recently had to be fabricated to their specs, I’m not sure what the turnaround time is on something like that, but they may have had to strip the back off of the building before they could develop their design completely.

Link to comment
Share on other sites

  • The title was changed to 1111 Rusk: Texaco Building Renovations
  • The title was changed to Texaco Building At 1111 Rusk St.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...