A few months back things had really slowed down. Definitely a week or two straight with no activity that I noticed (I live a few blocks away). Over the last month or so there the work has picked up. They have been closing one lane on W Gray pretty regularly and trucks have been going in and out. And their staging area has had plenty of material come in and out.

Link to comment
Share on other sites

  • 3 weeks later...
  • 2 weeks later...
  • 2 weeks later...
  • 2 weeks later...
  • 4 weeks later...
  • 2 weeks later...
  • 3 weeks later...
  • 4 weeks later...

Noticed the sign on west gray westbound just before Dolce is updated to say "Lane Closures April 4 to May 4" i believe are the dates. So hopefully that is for Dolce, though could be for Proguard working on the sidewalk in front of their location.

Link to comment
Share on other sites

  • 2 weeks later...
  • 3 weeks later...

This is what I understand about the status of the project at this time:

 

West Building:

- Due to heavy rain last year, the top two floors had to be deconstructed and replaced, along with all the siding.

- Nearly all "fixes" are complete, with some small additional work on the roof required.

- Currently waiting on permits to begin substantial work again.

 

East Building:

- Similar issues, but farther along.

- At this time, they are working on permits floor by floor.

- Top floor just received permits for plumbing/electrical and they just started installing that equipment.

- They will work their way down as the permits come through.

Edited by DrLan34
  • Like 7
Link to comment
Share on other sites

  • 2 weeks later...
  • 1 month later...
  • 2 weeks later...
  • 3 weeks later...
  • 3 weeks later...
  • 3 weeks later...
  • 4 weeks later...
  • 3 weeks later...
  • 2 months later...

I wonder what the story is behind this building? Only 2 guys must be working on it, the eastern building is starting to look in disrepair already. Hines could have built a 200 story building in the time it's taking these guys. I wonder if they are hoping for a insurance payout.

 

77PBNKK.jpg

  • Like 9
Link to comment
Share on other sites

  • 2 weeks later...
  • 1 month later...
  • 3 weeks later...

They put down all the framework and rebar and actually laid some sidewalk today along Gray. Progress, but the facade of the western buildings hasn't been touched so I assume the fencing will remain up for some time and the new sidewalk won't be accessible.

  • Like 3
Link to comment
Share on other sites

  • The title was changed to Dolce Midtown: Multifamily At 210 W. Gray St.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...